The Department of the Treasury is procuring operation and maintenance services for its Wastewater Pretreatment Plant located in Washington, DC. The contractor will be responsible for managing, operating, and maintaining the facility on a 24/7 basis, which includes multiple wastewater pretreatment systems and an on-site laboratory. Key requirements include technical support for the Wastewater and Storm Water Programs and adherence to environmental health and safety regulations.
Get your fit score, win probability, and required capabilities.
The Bureau of Engraving & Printing’s (BEP) Facility located in Washington, DC contains an Industrial Wastewater Pretreatment Plant (WWPP). BEP’s
objective is to procure contractor services to manage, operate, maintain supplies and perform maintenance and provide technical support for the Wastewater and Storm Water Programs. The WWPP requires services to support the BEP on a 24/7 basis. The WWPP currently consists of four (4) systems: (1) Wiping Solution Wastewater Pretreatment Plant (WSWPP), (2) Plating Wastewater Pretreatment Plant (PWPP), (3) Grease Trap Wastewater Pretreatment Plant (GTWPP), and (4) Wiping Solution Recycling Plant (WSRP). The WWPP includes an on-site lab and a materials storage area. Marico Sellers Contracting &C STREET, SW (No Street Address
2) WASHINGTON, DC 20228 USA to this opportunity. Att 1 - BEP 017-12.pdf Att 12 - EHS
Requirements for Purchased Materials.pdf Attachment A - PWS Waste Water Pretreatment Plant Operation and Maintenance_v4.pdf Att 5 - WSRP Process Description.pdf Att 18 - Sodium Hydroxide Specification.pdf Att 19 - Sodium-Sulfated Castor Oil Specification.pdf Att 23 - Spare Parts and Supplies.pdf Att 3 - PWPP Process Description.pdf Att 2 - WSWPP Process Description.pdf Attachment 28 Staffing Plan.doc Att 13 - Restricted Materials at DCF.pdf Att 22 - Process and Treatment Chemicals.pdf Att 26 - Equipment.pdf Att 8 - EHS Contractor
Requirements.pdf Att 25 - Laboratory Analysis.pdf Att 24 - Nonreimburseable Tools - Janitorial - PPE Supplies.pdf Attachment 27 - Corrosion Monitoring.pdf Attachment C - Site Visit Information.pdf Att 4 - GTWPP Process Description.pdf Att 20 - Boxes - Lids Specification.pdf Att 14 - Bentonite Specification.pdf Att 15 - Sulfuric Acid Specification.pdf Att 17 - Filter Aid Specification.pdf Att 21 - Pallets Specification.pdf Att 16 - Sodium Bisulfite Specification.pdf Att 11 - Wage Determination.pdf Attachment 29 - Monthly Workforce Report.docx Attachment B -
Pricing Sheet.xlsx Att 10 - PWPP Equipment List.pdf Att 9 - WSWPP Equipment List.pdf Att 7 - BEP Furnished Equipment.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.