Closed
Save

Winch Controller Assembly Bumper Bean Isolator Engineering Solutions Needed

Department of Defense (DoD) > U.S. Navy > Naval Air Systems Command (NAVAIR)Sol: N00019-26-SIMACQ-APM299-0409
8(a)SDVOSB
est. $20K – $500K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Naval Air Systems Command (NAVAIR) is seeking information on engineering solutions for the obsolete Winch Controller Assembly Bumper Bean Isolator for the MH-60 Multi-Mission Helicopter Program. Key requirements include the development of preliminary redline drawing markups, a non-indentured Bill of Material, and an engineering obsolescence report.

Generated 61d ago

Scope & Requirements

The work involves providing engineering solutions for the Winch Controller Assembly Bumper Bean Isolator, including design, qualification, and testing of solutions compliant with military specifications.

Deliverables

  • Preliminary redline drawing markups
  • Non-indentured Bill of Material (BOM)
  • Engineering obsolescence report

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Estimated Value
est. $20K – $500K
Similar contracts award $2K$218K (median $22K, 28,757 awards)Above typical range
Period of Performance
6 months
Incumbent Contractor
Enterprise Ventures Corporation (EVC)
NAICS Codes
Set-Asides
8(a), SDVOSB

Qualifications & Eligibility

NAICS Size Standard
1,350 employees

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE NAVY
Office
Naval Air Systems Command (NAVAIR)

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Apr 3, 2026
Last Updated2mo ago
Apr 3, 2026
Became Solicitation2mo ago
Apr 3, 2026
Tracked
Response Due2mo ago
Apr 13, 2026
Earliest contract award date5d ago
May 30, 2026

Description

1.0 INTRODUCTION The Naval Air Systems Command (NAVAIR), in support of PMA-299 MH-60 Multi-Mission Helicopter Program Office, is seeking information regarding the current capability to provide evaluation, identification, and proposed engineering solution for the Winch Controller Assembly (WCA part number 38010-2; NIIN

016444306) Bumper Bean Isolator (part number PRV-0891-23) within the Airborne Mine Countermeasure (AMCM) Carriage, Stream, Tow and Recovery System (CSTRS) Weapons Replaceable Assembly (WRA). The proposed solution should include development of preliminary redline drawing markups, and a non-indentured Bill of Material (BOM) of the bumper bean isolator. Additionally, the Contractor will deliver an engineering obsolescence report summarizing all obsolescence issues currently residing in the CSTRS. 2.0 DISCLAIMER THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY. RESPONSES TO THIS SOURCES SOUGHT WILL NOT BE RETURNED. RESPONDENTS WILL NOT BE NOTIFIED OF THE RESULTS OF THE REVIEW. 3.0

BACKGROUND The Bumper Bean Isolator is part of the Winch Controller Assembly and is obsolete, requiring analysis of alternatives. The incumbent is Enterprise Ventures Corporation (EVC). 4.0

ELIGIBILITY The applicable NAICS code for this requirement is 334511 with a Small Business Size Standard of 1,350 employees. The applicable is 5845, Underwater Sound Equipment. Businesses of all sizes are encouraged to respond; however, each respondent must clearly identify their business size. 5.0 ANTICIPATED

PERIOD OF PERFORMANCE The estimated

period of performance is 6 months. Assume the earliest contract award date of

Get matched to contracts like this daily

Free AI-powered contract matching for your business.