Quick Brief

The Department of Defense is procuring generator step-up (GSU) transformers for the Oahe Dam in South Dakota and the Fort Peck Dam in Montana. Key requirements include the design and manufacturing of new transformers, ancillary components, and performance testing, with final acceptance testing to be conducted after interconnection to the power plants.

Generated 61d ago

Scope & Requirements

The project involves the supply of GSU transformers for two dams, including design, manufacturing, testing, and delivery to the respective power plants.

Deliverables

  • Design and manufacturing of two new GSU transformers for Fort Peck Dam
  • Design and manufacturing of 10 new GSU transformers for Oahe Dam
  • Design and manufacturing of ancillary and control components
  • Performance of Factory Acceptance Testing (FAT)
  • Delivery and offloading at the transformer temporary storage
  • Transformer reassembly, oil processing and filling
  • Final acceptance testing and commissioning of transformers

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Value
$2K – $25K per task order
IDIQ ceiling: $57.0M
Similar contracts award $2K$25K (median $7K, 9,044 awards)
Incumbent Contractor
PAF ELECTRICAL, INC.
NAICS Codes
Place of Performance
Gilbert, AZ, USA

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside (FAR 19.5)

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE ARMY US ARMY CORPS OF ENGINEERS ENGINEER DIVISION NORTHWESTERNENDIST OMAHA

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Feb 20, 2026
Last Updated3mo ago
Feb 20, 2026
Became Solicitation3mo ago
Feb 20, 2026
Tracked
Response Due3mo ago
Mar 16, 2026

Description

the generator step-up (GSU) transformers 4 and 5 located in switchyard #2 at the Fort Peck Dam. The final suppy contract for the Fort Peck transformers will include: Design and manufacturing of two new GSU transformers. Design and manufacturing of ancillary and control components. Performance of Factory Acceptance Testing (FAT). Delivery to the Fort Peck power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor. Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor. Oahe Supply of all GSU transformers locatd at Oahe Dam. The supply contract for the Oahe transformers will include: Design and manufacturing of 10 new GSU transformers. Design and manufacturing of ancillary and control components. Performance of Factory Acceptance Testing (FAT). Delivery to the Oahe Dam power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor. Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor. Brandie Murphy Alternative