The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring generator step-up (GSU) transformers for the Oahe Dam in South Dakota and the Fort Peck Dam in Montana. Key requirements include the design and manufacturing of new transformers, ancillary components, and performance testing, with final acceptance testing to be conducted after interconnection to the power plants.
The project involves the supply of GSU transformers for two dams, including design, manufacturing, testing, and delivery to the respective power plants.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govthe generator step-up (GSU) transformers 4 and 5 located in switchyard #2 at the Fort Peck Dam. The final suppy contract for the Fort Peck transformers will include: Design and manufacturing of two new GSU transformers. Design and manufacturing of ancillary and control components. Performance of Factory Acceptance Testing (FAT). Delivery to the Fort Peck power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor. Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor. Oahe Supply of all GSU transformers locatd at Oahe Dam. The supply contract for the Oahe transformers will include: Design and manufacturing of 10 new GSU transformers. Design and manufacturing of ancillary and control components. Performance of Factory Acceptance Testing (FAT). Delivery to the Oahe Dam power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor. Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor. Brandie Murphy Alternative
Point of Contact Marc Proietto to this opportunity.
Get matched to contracts like this daily
Free AI-powered contract matching for your business.