Closed
Save

Ball Bearing, Annular, Antifriction, Unmounted

Department of Defense (DoD) > Navsup > NAVSUP WSS MECHANICSBURG
est. $37K – $350K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring Annular Ball Bearings for the Navy. Key requirements include compliance with quality standards, production lot testing, and a warranty of one year from the date of delivery.

Generated 61d ago

Scope & Requirements

The contract includes the requirements for the manufacture and quality assurance of Annular Ball Bearings.

Evaluation Criteria

  1. Past Performance

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Estimated Value
est. $37K – $350K
Similar contracts award $754$10K (median $3K, 32,971 awards)Above typical range
NAICS Codes

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside
NAICS Size Standard
1250
Past Performance
Past performance will be considered in the evaluation of offers.
Required Registrations
  • SAM.gov

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
NAVSUP
Office
NAVSUP WSS MECHANICSBURG

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published4mo ago
Feb 10, 2026
Last Updated4mo ago
Feb 10, 2026
Became Solicitation4mo ago
Feb 10, 2026
Tracked
Response Due3mo ago
Mar 12, 2026

Description

|4|N741.11|GDN|N/A|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C AND SECTION E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| PRODUCTION LOT TESTING|1|45 DAYS| INSPECTION/ACCEPTANCE POINT|6|TBD|TBD|TBD|TBD|TBD|TBD| DESIRED AND REQUIRED TIME OF DELIVERY (JUNE 1997)|29|CLIN 0001AA|5|180||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|STAND-ALONE RECEIVING REPORT-CERIFICATIONS;COMBO-RECEIVING REPORT & INVOICE-MATERIAL|N/A|TBD|N00104|TBD|TBD|W25G1U-5|TBD|N/A|N/A|N/A|N/A|N/A|N/A|SEE FORM DD1423|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR FROM DATE OF DELIVERY|ONE YEAR FROM DATE OF DELIVERY. ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332991|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEV 2026-O0028)(FEB 2026))|3|||| The subject amendment is hereby incorporated to. The purpose of this solicitation amendment is to state NSN: 3HD 3110 015741702NT ITEM: Annular Ball Bearing is now determined a commercial item. Thefollowing clauses have been added/removed from the solicitaiton. Please seecontinuation pages for details. This amendment makes no other changes to the solicitation. 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4. If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 5. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.gov website. After requesting access, send an email to the POC listed on the solicitation. 7. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers IAW FAR 13.106(a)(2). 8. This solicitation requires Production Lot Testing (PLT). See Local NAVSUP clause WWSTERMEZ02 Production Lot Testing for more details. 1. SCOPE 1.1 This contract/purchase order contains the

requirements for manufacture and the contract quality

requirements for the BEARING,BALL,ANNULA . 1.1.1 ;Required item is to be procured and adhere to MIL-DTL-17931F Military Specification for 'Bearings, Ball, Annular, For Quiet Operation' and other applicable documents referenced herein.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.2 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DOCUMENT REF DATA=MIL-STD-12 | | |D |810529|A| | | DOCUMENT REF DATA=ANSI/ABMA 20 | | | |200101|A| | | DOCUMENT REF DATA=ANSI/ABMA10A | | |A |150101|A| | | DOCUMENT REF DATA=MIL-STD-105 | | |E |950227|A| | | DOCUMENT REF DATA=MIL-STD-129 | | |P |041029|A| |03| DOCUMENT REF DATA=FF-B-171 | | |B |950309|A| 1| |1 | |53 |920303 DOCUMENT REF DATA=SAE J418 | | |A |831201|A| | | DOCUMENT REF DATA=AMS 6444 | | |P |210501|A| | | DOCUMENT REF DATA=ANSI/ABMA STD-9 | | | |150101|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |961001|A|2 | | DOCUMENT REF DATA=SAE 52100 | | | | |A| | | DOCUMENT REF DATA=ANSI/AFBMA STD 13 | | | |870902|A| | | DOCUMENT REF DATA=MIL-DTL-17931F | | | |250207|A| | | DOCUMENT REF DATA=MIL-PRF-24508B | | | |201221|A| | | DOCUMENT REF DATA=ASTM-E112 | | | |241109|A| | | DOCUMENT REF DATA=MIL-PRF-17331 | | |J |070330|A| 1| | |Y|97 |940720 DOCUMENT REF DATA=ASTM-E18 | | | |240215|A| | | DOCUMENT REF DATA=MIL-STD-1916 | | | |960401|A| | | DOCUMENT REF DATA=ASTM-F2215 | | | |051123|A| | | DOCUMENT REF DATA=ASTM-A295 | | |92 |920815|A| | | DOCUMENT REF DATA=ASTM-E45 | | | |250828|A| | | DOCUMENT REF DATA=MIL-PRF-6085 | | |D |980220|A| | | |Y|14 |920916 DOCUMENT REF DATA=ISO9001 | | | |010417|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |920417|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| DOCUMENT CHANGE DATA=MIL-L-17331 |MIL-PRF-17331 DOCUMENT CHANGE DATA=MIL-L-6085 |MIL-PRF-6085 3.

REQUIREMENTS 3.1 ;Source Control Item - Previous delivery of this specified National Stock Number or similar item manufactured to technical procurement specifications and MIL-DTL-17931F supplied by a Government activity or Price Contractor does not in itself qualify a supplier as a Government approved source. Only those sources for this item currently approved by the Government will be considered for this award. The time required for approval of a new supplier is normally such that award cannot be delayed pending approval of the new source. Qualification and testing

requirements are extensive and time consuming. To maintain appropriate stock levels and prevent work stoppage, a prospective contractor must be determined to be qualified by the engineering activity prior to submitting offer. If you have not been solicited and you can furnish either

  • (a) proof of your prior approval as a supplier of this item, or
  • (b) data showing you have produced the same or similar items satisfactorily for the Government or a commercial source, or
  • (c) test data indicating your product can meet service operating

Get matched to contracts like this daily

Free AI-powered contract matching for your business.