Closed
Save

Restoration of Real Property at White Sands

Dept. of the Interior > Interior Business Center

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of the Interior is seeking a contractor to repair Tunnel 7 at White Sands Missile Range for the Defense Threat Reduction Agency. The project includes site preparation, structural repairs, and instrumentation for testing.

Generated 57d ago

Scope & Requirements

Repair Tunnel 7 at White Sands Missile Range, including site preparation, structural repairs, and instrumentation for testing.

Deliverables

  • Site preparation and improvements
  • Structural repairs to Tunnel 7
  • Instrumentation for testing
  • Post-testing safety measures

Contract Details

Contract Value
Not specified
Similar contracts award $25K$400K (median $99K, 73,582 awards)
NAICS Codes
Place of Performance
White Sands, NM, USA

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside

Agency & Contact

Contracting Organization

Agency
INTERIOR, DEPARTMENT OF THE
Sub-Agency
Interior Business Center
Office
Acquisition Services Directorate

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 18, 2026
Last Updated3mo ago
Mar 18, 2026
Questions and Answers3mo ago
Mar 18, 2026
Response Due2mo ago
Apr 1, 2026

Description

The Department of the Interior (DOI), Interior Business Center (IBC), Acquisition Services Directorate (AQD), on behalf of the Department of Defense (DoD), Defense Threat Reduction Agency (DTRA) at White Sands Missile Range (WSMR) in New Mexico is seeking to a contract to repair Tunnel 7 for DTRA at the WSMR ALT-SHIST. The repair project to Tunnel 7 includes all pertinent and necessary site preparations, site improvements, safing, and restoration and modification of the structure for both pre and post testing. The contractor shall repair a D-shape tunnel and overburden using the D-shape of 20 feet depth and width, inside the tunnel. The contractor shall remove and repair any damage to the ribs, crown, and invert to Tunnel 7. After the repair of Tunnel 7, the contractor shall provide general construction support to instrument the tunnel in preparation for testing and then safe the tunnel for re-entry post-testing.The purpose of this amendment is to:1) Update the CLIN structure in Section B and Attachment 10 to include the optional line items 6-8 and Instrumentation Work.2) Update the liquidated damages under Clause 52.211-11 to $395.00 per day. McCullough, Stephanie to this opportunity. Sol_140D0426R0019_Amd_0003.pdf Sol_140D0426R0019_Amd_0002.pdf Attachment_10_-_Pricing_Sheet_Amend_0002_0002.xlsx 140D0426R0019_0002_0002.pdf Sol_140D0426R0019_Amd_0001.pdf 140D0426R0019_0001_0001.pdf

Questions_and_Answers_0001.xlsx Attachment_10_-_Pricing_Sheet_Amend_0001_0001.xlsx Sol_140D0426R0019.pdf Attachment_1_-_Statement_of_Work.pdf Attachment_9_-_Past_Performance_Questionnaire.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.