The response deadline has passed. Review the details for future reference or to track similar opportunities.
The proposed scope of this project includes reconstruction of the pavement within a parking lot servicing the boat ramp in the North Point Recreation Area near Pickstown, South Dakota. The project will address deteriorated pavement and sub-base for the 98,000 square-foot parking lot on the east side of the North Bay just upstream of the Fort Randall dam on the Missouri River. The project will provide a new pavement surface for the parking area while maintaining the operational qualities of this popular summer boat launch area. SCOPE OF THE WORK: The project will consist of removal of excavating the existing parking lot鈥檚 asphalt and base to a depth of 9.5-inches and placement of a 3.5-in asphalt pavement on 6-inches of aggregate base. Subexcavation work includes removing poor subgrade soils in the area. Parking lot slopes will match existing conditions with minor adjustments made to create an American Disabilities Act compliant handicap parking stall. A concrete pad for a dumpster and signing and striping are also included in the project. The parking lot will be closed during construction activities. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 5,700 CUYD 20402-0000 Subexcavation: 3,000 CUYD 30202-2000 Roadway Aggregate, Method 2: 3,800 TON 40301-0000 Asphalt Concrete Pavement, 2,300 TON Stephanie Navarro Alternative
Point of Contact Ryan Phillips Contracting . DAKOTA AVE (No Street Address
2) LAKEWOOD, CO 80228 USA to this opportunity. Final.BidTabulationReport.pdf Bid Opening Summary- SD FLAP SDGFP Parking (1) North Point Parking Lot.pdf QnA. 5.12.26.pdf Amendment A001-SD FLAP SDGFP Parking (1) North Point.pdf QnA. 5.11.26.pdf QnA. 4.28.26.pdf fp-24.pdf Design Physical Data and Reports.zip 23.100 Floodplain Development Memo.pdf SD FLAP SDGFP AD Pavement Report.pdf SD FLAP SDGFP AD Plans.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.