Closed
Save

Gas Turbine Bleed Air Hose Insulation

Homeland Security (DHS) > U.S. Coast GuardSol: 70Z8526Q025799
SBFFP
est. $12K – $306K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Homeland Security is procuring insulation covers for the Gas Turbine Bleed Air Hose on the USCGC Munro to restore its operational capability. The contractor will manufacture removable insulation covers according to specified dimensions and materials to address an immediate need caused by damaged insulation. The work must be completed promptly to minimize operational impacts on the vessel.

Generated 27d ago

Scope & Requirements

The contractor will manufacture and deliver insulation covers for the Gas Turbine Bleed Air Hose on the USCGC Munro to restore the vessel's operational capability.

Contract Details

Contract Typei
FFP
Estimated Value
est. $12K – $306K
Similar contracts award $12K to $281K (median $55K, 32,038 awards)Within typical range
Period of Performance
2026-07-01 to 2026-07-15
NAICS Codes
Place of Performance
Alameda, CA, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
Total Small Business

Agency & Contact

Contracting Organization

Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-Agency
US Coast Guard

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published29d ago
Jun 26, 2026
Became Solicitation28d ago
Jun 26, 2026
Tracked
Last Updated27d ago
Jun 27, 2026
Response Date24d ago
Jul 1, 202608:00 AM PDT
Response Due23d ago
Jul 1, 2026

Description

FOR GAS TURBINE BLEED AIR HOSE INSULATION CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW). 1.0 GENERAL

Background USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine. Scope The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.

OBJECTIVE The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander. APPLICABLE DOCUMENTS Reference Documents The following documents may be helpful to the Contractor in performing the work described in this document: Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001) Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210 SPECIFIC

REQUIREMENTS/TASKS Existing insulation cover dimensions are as follows: Length Width Thickness Inner Layer 34” 22” 2” Outer Layer 45” 28” 2” Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity. 3.0 OTHER APPLICABLE CONDITIONS 3.1

Period of Performance - The

period of performance for this contract shall be between 01JUL2026 & 15JUL26. 3.2

Get matched to contracts like this daily

Free AI-powered contract matching for your business.