The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of the Navy, through NAVSUP Weapon Systems Support, is procuring two TOOL-CONT REMOVA units under a fixed-price contract with delivery required within 90 days, subject to government source inspection per FAR 52.246-2. The work involves manufacturing to specified drawings available on SAM.gov, with all shipping costs borne by the contractor to designated DODAAC locations.
Manufacture of two TOOL-CONT REMOVA units according to specified drawings and technical requirements, with delivery to designated DODAAC locations and compliance with government source inspection standards.
|4|N97113|FB|771-229-0460|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| SPECIAL SHIPPING AND MARKING INSTRUCTIONS|6|x||x|||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|Inspection / Acceptance Point: Source|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|[email protected]| NOTE FOR CONTRACTOR/ADMINISTRATIVE
CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332216|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Due date for offers is extended to
30 APR 2026. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY 90 DAYS. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. \ NOTE THE CHANGE IN QTY FROM 4 to 2. TO VIEW THE DRAWINGS: Go to www.sam.gov Click: Contract Opportunities and enter the solicitation number. This gives access to the Electronic Solicitation. Drawings can be viewed or downloaded. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY 90 DAYS. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. \ Amended to include drawings uploaded to sam.gov This is not an FMS Requirement/contract. Due to limitations, the FMSdesignation could not be removed. Contractor is liable for all shippingexpenses to DODAAC location(s) specified within Consignment Instruction notesin contract. TO VIEW THE DRAWINGS: Go to www.sam.gov Click: Contract Opportunities and enter the solicitation number. This gives access to the Electronic Solicitation. Drawings can be viewed or downloaded. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY 90 DAYS. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. \ 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture of the TOOL-CONT REMOVA . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the drawings shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=2825609 |10001| A| |D| | | | DOCUMENT REF DATA=WS6117 | | | | |A| | | DOCUMENT REF DATA=MIL-STD-130 | | |M |051202|A| | | DOCUMENT REF DATA=QQ-A-225 |0003| |D |980407|A| | | DOCUMENT REF DATA=QQ-S-763 | | |F |981005|A| | | DOCUMENT REF DATA=MIL-D-1000 |0001| |A |701105|A| | | DOCUMENT REF DATA=MIL-T-31000 | | | |960601|A| 2| | DOCUMENT CHANGE DATA=MIL-D-1000 |MIL-T-31000 DOCUMENT CHANGE DATA=MIL-T-31000 |CANCELLED DOCUMENT CHANGE DATA=QQ-A-225 |CANCELLED DOCUMENT CHANGE DATA=QQ-S-763 |CANCELLED 3.
REQUIREMENTS 3.1 Manufacturing and Design - The TOOL-CONT REMOVA furnished under this contract/purchase order shall meet the material and physical
requirements as specified ;on drawing number 2825609P1, CAGE 10001, REV D; . 3.2 Marking - Unless marking
Get matched to contracts like this daily
Free AI-powered contract matching for your business.