Closed
Save

Maintenance Dredging at Naval Submarine Base Kings Bay, Camden County, Georgia

Department of Defense (DoD) > U.S. Army
FFP
$44K – $1.1M per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring maintenance dredging services for the Naval Submarine Base Kings Bay in Camden County, Georgia. The work includes base maintenance dredging, additional field cut weir riser boards, secondary maintenance dredging, and mobilization/demobilization, with a total performance period of 305 calendar days. This opportunity is set aside for small businesses, with a price target range between $10,000,000 and $25,000,000.

Generated 30d ago

Scope & Requirements

The project involves maintenance dredging at specified locations, including the placement of dredged material at designated disposal areas, along with additional options for field cut weir riser boards and secondary dredging.

Evaluation Criteria

  1. Lowest Price Technical Acceptable

Contract Details

Contract Typei
FFP
Awarded Amount
$44K – $1.1M per task order
IDIQ ceiling: $37M
Similar contracts award $44K$1.1M (median $204K, 8,719 awards)
Period of Performance
305 calendar days
NAICS Codes
Place of Performance
Camden County, Georgia, USA

Qualifications & Eligibility

Set-Aside Category
Total Small Business
NAICS Size Standard
$37 million
Required Registrations
  • SAM.gov

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

RFP Issuance2mo ago
Apr 8, 2026
Published1mo ago
Apr 27, 2026
Last Updated1mo ago
Apr 27, 2026
Pre-Bid Conference1mo ago
Apr 27, 202610:00 AM
Mandatory
Became Award Notice1mo ago
Apr 27, 2026
Tracked
Proposal Due Date27d ago
May 8, 2026
Response Due21d ago
May 14, 2026

Description

THIS OPPORTUNITY IS AVAILABLE ONLY TOTHE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP25R0010:AGM Marine Contractors Inc. (W912EP25D0011); AHTNA Marine and Construction Company LLC (W912EP25D0012); Atlantic and Gulf Dredging and Marine LLC (W912EP25D0013); Coastal Dredging Co., Inc. (W912EP25D0014); Cottrell Contracting Corporation (W912EP25D0015); Next Generation Logistics LLC. (W912EP25D0016); Southern Dredging Co, Inc. (W912EP25D0017); Southwind Corporation Corp. (W912EP25D0018); and Waterfront Property Servies LLC Gator Services (W912EP25D0019).A Pre-Bid Conference will be held via teleconference on

27 April 2026 @ 10:00AM, EDT.Please utilize the link and call information provided below:- LINK: HTTPS://WWW.MICROSOFT.COM/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING- Meeting ID: 993 325 182 157 / PASSCODE: 85YU3Wy3- DIAL IN BY PHONE: +1 503-207-9433 / PHONE CONFERENCE ID: 793 526 23#It is requested that an email be sent to [email protected] and [email protected] no later than

24 April 2026 at 1:00 PM, EDT to confirm attendance by your organization.DESCRIPTION OF WORK: Work is divided into a Base and three options as indicated below. For the base and dredging options, this contract incorporates two feet of allowable overdepth throughout.Base work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area 1 (D/A-1) and Disposal Area 2 (D/A-2) as shown on the drawings and as directed by the

Contracting Officer. Additional Base work also includes bird monitoring and standby time.Option AWork consists of supplying additional field cut weir riser boards as requested by the

Contracting Officer.Option BWork consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area 1 (D/A-1) and Disposal Area 2 (D/A-2) as shown on the drawings and as directed by the

Contracting Officer. Option B work also includes bird monitoring and standby time.Option CWork consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work.The Request for Proposals (RFP) will be issued on or about

Get matched to contracts like this daily

Free AI-powered contract matching for your business.