Closed
Save

Additively Manufactured Nonpowered Pipe Fitting Manufacturing

Department of Defense (DoD)
FFP
est. $15K – $65K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring additively manufactured components for the Navy, specifically focusing on nonpowered pipe fitting manufacturing. Key requirements include adherence to specific material and testing specifications, mandatory use of additive manufacturing, and submission of certification data prior to delivery.

Generated 3d ago

Contract Details

Contract Typei
FFP
Estimated Value
est. $15K – $65K
Similar contracts award $893 to $19K (median $5K, 12,165 awards)Above typical range
NAICS Codes

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published5d ago
Jul 20, 2026
Last Updated5d ago
Jul 20, 2026
Became Solicitation4d ago
Jul 20, 2026
Tracked
Response Due2d ago
Jul 23, 2026

Description

(JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|SEE SPECIFICIATIONS SECTIONS C AND E | INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - CertificationsCombo - Receiving Report & Invoice - Material|TBD|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material|N50286|TBD|133.2||TBD|;N39040 - Certifications;|||;See DD 1423;|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| PROGRESS PAYMENTS (DEVIATION 2026-O0022)(FEB 2026)|4||||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1||

INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (DEV 2026-O0048)(MAR 2026)|2||| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|FIRM FIXED PRICE| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| 1.This is a Level One Requirement. 2.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 3.The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 4.This requirement requires the mandatory use of Additive Manufacturing for specific piece part components as outlined within the technical data package for this end item. As such, the vendor shall conform to all specifications of meeting both the piece part conformance and the total end item specifications material, marking, testing and acceptance

requirements. 5.Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See clause FAR 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 6.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 18 working days after receipt Final delivery of material (200 days) 7.Partial and early delivery of requirement is authorized and desired and is at no additional cost to either the vendor or the Government. 8.NAVSUP WSS Mech will be considering past performance in the evaluation of offers. See Clause 252.204-7024. 9.Drawings associated with this solicitation will be made available on SAM.GOV, but will be restricted access which needs to be approved. Once access has been requested, interested vendors should email the POC listed on the solicitation to inform them of the request. 10.NECO bids will not be accepted, offers must include original RFP and be emailed to: [email protected] and [email protected] \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=STD-A1465 |53711| A|ER |D| | | | DRAWING DATA=STD-A773 |53711| A|ER |D| | | | DRAWING DATA=STD-A795 |53711| A|ER |D| | | | DRAWING DATA=2633-561-01R8 |53711| A|ER |D| | | | DRAWING DATA=2633-561-02B5 |53711| A|ER |D| | | | DRAWING DATA=6640811 |53711| R| |D| | | | DRAWING DATA=7549599 |53711| B| |D| | | | DOCUMENT REF DATA=802-8999910 | | | |241003|A| | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ-Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-21562 | | |F |241126|A| | | DOCUMENT REF DATA=MIL-PRF-32804 | | |- |251027|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=A-A-59004 | | |B |081118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | DOCUMENT REF DATA=S9074-A4-GIB-010/AM-WIRE-DED | | |1 |240708|A| | | 3.

REQUIREMENTS 3.1 ;The 12.00 X 6.00 NPS Cascade Orificial Resistive Device (C.O.R.D.) must be in accordance with NAVSEA Drawing 801-6640811, Assembly 206-5, and all liabilities provided with this Contract/Purchase Order, except as amplified or modified herein.; 3.2 Contract Support Library - Additional

requirements for this item are identified as Contract Support Library Reference Number ;CSD708 and CSD739; in ECDS at https://register.nslc.navy.mil/ 3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, Piece 43A of Drawing 7549599, Additively Manufactured; Material - ;MIL-PRF-32804 Grade A Class 1, A non-integrated build platform per MIL-PRF-32804 is mandatory, however, quantitative chemical and mechanical analysis certifications are not required for the build platform., MIL-PRF-32804 paragraph 3.1 is clarified as follows: Feedstock lots from separate heats must not be used in the same manufacturing lot. Each Level I AM DED part must be made from one heat of feedstock., Add the following paragraphs to MIL-PRF-32804 as follows: "3.10 Product Marking - Mark with "MIL-PRF-32804", manufacturer Name or CAGE Code and manufacturing lot number. Markings must be permanently applied in accordance with MIL-STD-792; an alternate marking method is permissible provided it is an available option in the contractually invoked drawing or specification. Markings must be located so as not to affect the form, fit, or function of the material and must be legible after all required surface finishing and post-processing operations." "5.1.1 Package Marking. In addition to other packaging and labeling

requirements required by the contract; each unit, intermediate and exterior shipping container shall be marked with "MIL-PRF-32804", Manufacturers Name or Trademark, and Manufacturing Lot number. This marking shall be placed on each MIL-STD-129 label required by the contract and will be placed either below the identification test marking or in a conspicuous location on the identification marked side of the container.", All surfaces of the finished Additively Manufactured part must be ground, machined, or otherwise finished to produce smooth surfaces that meet the finishes indicated on the drawing. As-printed surfaces are not permitted. For components traditionally procured as a casting, surfaces indicated "as-cast" on the drawing must be ground, machined, or otherwise finished to produce a finish of 125 Ra or smoother., Note: The additively manufactured C.O.R.D. Body, Piece 43A, must be nondestructively inspected in accordance with S9074-A4-GIB-010/AM-WIRE DED Table 5-4, Category D3.; 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Quality Conformance/Compliance Inspection Item - ;Each heat/lot of Starting Feedstock for Wire Arc Directed Energy Deposition; Performance - ;MIL-DTL-21562; Acceptance - ;MIL-DTL-21562; Test - ;Visual Inspection; Item - ;Each Additively Manufactured Part; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;Per CSD708; Test - ;Dye Penetrant Inspection; Item - ;Each Additively Manufactured Part; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;Per CSD708, Additional guidance for nondestructive testing and extension of local qualified procedures for directed energy deposition Additively Manufactured product forms is provided in CSD739.; Test - Quality Conformance/Compliance Inspection Item - ;Each Additively Manufactured Part (Or Witness Coupon as required); Performance - ;S9074-A4-GIB-010/AM-WIRE DED Paragraph 4-2.4.2 and MIL-PRF-32804; Acceptance - ;MIL-PRF-32804 Table III; Test - ;Production Conformance Test Report; Item - ;Each Additively Manufactured Part; Performance - ;S9074-A4-GIB-010/AM-WIRE DED Paragraphs 2-2.3.3 and 5-6; Acceptance - ;S9074-A4-GIB-010/AM-WIRE DED Paragraphs 2-2.3.3 and 5-6; Test - ;Heat Treatment; Item - ;Each Additively Manufactured Part; Performance - ;MIL-PRF-32804; Acceptance - ;MIL-PRF-32804, Complete record of all heat treatments, including time, temperatures, atmospheric, and heating and cooling rates must be provided.; Test - ;5x Visual Magnification Inspection; Item - ;Weldment (label plate to body); Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035; Test - Non-Destructive Tests Item - ;Weld Repair (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification ;Complete record of all weld repaired defects including location, weld repair inspection results, post-weld heat treatment (if required) and the associated weld procedure approvals must be provided.; Test - ;Hydrostatic Test; Item - ;Each Assembly; Performance - ;General Note 9 of Drawing 6640811; Acceptance - ;General Note 9 of Drawing 6640811; 3.5 Radiography is required on ;Body, Piece 43A; . 3.6 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.7 Thread Inspection

Get matched to contracts like this daily

Free AI-powered contract matching for your business.