Renovation Of High-Water Reservoir No. 2

Department of Defense (DoD)Sol: GDP-B0061-5P
TBD
est. $250K – $1.2M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring the renovation of High-Water Reservoir Nr. 2 at the Baumholder Military Community. The project requires a two-step sealed bidding process, with the first step focusing on technical proposals that must meet specific German standards and include a progress schedule for completion within 270 days. The technical proposals must be submitted in English and in electronic PDF format by August 5, 2026.

Generated 16d ago

Scope & Requirements

Evaluation Criteria

  1. Method of accomplishment and materials to be used
  2. Progress Schedule
  3. Documentation for conducting business in Germany

Contract Details

Contract Type
TBD
Estimated Value
est. $250K – $1.2M
Similar contracts award $13K to $150K (median $35K, 3,862 awards)Above typical range
NAICS Codes

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published17d ago
Jul 8, 2026
Became Solicitation16d ago
Jul 8, 2026
Tracked
Last Updated15d ago
Jul 10, 2026
Response Date3d ago
Jul 22, 202617:00
GMT+2
Response Due2d ago
Jul 22, 2026
Technical Proposal Duein 11d
Aug 5, 202617:00
Central European Summer Time (CEST)

Description

the supplies or services required The project entails the renovation of High-Water Reservoir Nr. 2 (Building #8444) at the Baumholder Military Community. Full details of the project are included in the attached Statement of Work (SOW) and affiliated

attachments (1-5).

  • (ii) Statement of intent to use the two-step method This solicitation and resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in RFO Part 14.211. Step One is a request for technical proposals only, and offerors determined to be acceptable will be notified of Step Two via receipt of the Invitation for Bid (IFB) solicitation document.
  • (iii)

Requirements of the technical proposal The technical proposal must include at least the following: Set up so that no additional explanations and information are required. Indication of the applied German Institute for Standardization, or Deutsches Institut für Normung (DINs), Regulations and Standards. Sketches/Drawings, if necessary. Submitted in English. Provided in electronic PDF format. Provide all information/documents requested in the technical

evaluation criteria. (iv)

Evaluation criteria, including all factors and any significant subfactors Proposals will be evaluated to be "Acceptable", "Reasonably susceptible of being made acceptable", or "Unacceptable" based on the following technical criteria: FACTOR 1: Offerors shall show method of accomplishment and materials to be used. Offerors must submit a copy of specifications and materials proposed, describing how the project will be accomplished as required by the SOW. Proposed materials and methods must meet or exceed minimum applicable DIN standards. FACTOR 2: Offerors shall provide a Progress Schedule outlining the plan to meet the 270 calendar day delivery time for all specification