The Department of Veterans Affairs is contracting for the repair of a wastewater lift pump at the VA Jackson Regional Office in Mississippi. The project involves the removal, off-site repair, and reinstallation of the pump, requiring compliance with safety standards and operational testing. The contractor must provide all necessary labor, materials, and equipment, and the work must be completed during normal business hours.
The contractor will remove, repair, and reinstall a wastewater lift pump, ensuring compliance with safety and operational standards.
Lift Pump Removal, Repair, and Reinstallation Services VA Jackson Regional , Mississippi SUMMARY This Statement of Work (SOW) outlines the
requirements for the removal, off site repair, and reinstallation of one wastewater lift pump located in the West Lift Station at the VA Jackson Regional Office. The contractor shall provide all labor, materials, equipment, transportation, and technical expertise necessary to restore the pump to full operational status. The project includes pump removal, disconnection of related piping and electrical components, off site rebuilding with an estimated turnaround of 3 5 days, and full reinstallation with operational testing. The contractor must comply with major VA facility security and access
requirements. Work shall be performed during normal business hours and coordinated with the
Contracting Officer s Representative (COR).
BACKGROUND The VA Jackson Regional . One wastewater lift pump (Pump #1 in the West Lift Station) requires removal, off-site repair, and reinstallation to ensure continued safe operation of the wastewater handling system.
SCOPE OF WORK The Contractor shall provide all labor, equipment, materials, tools, supervision, and transportation necessary to perform the following tasks: Removal of Pump #1 from the West Lift Station control box. Disconnection and removal of necessary piping, electrical wiring, and pump-mounted hardware. Off-site pump rebuilding with an estimated lead time of 3 5 days. Replacement or refurbishment of worn or damaged internal components. Reinstallation of the repaired pump and motor assembly. Reconnection of all piping and electrical lines in accordance with all applicable codes and safety standards. Operational checks to confirm functional performance and system readiness. All work shall be completed during normal business hours. TECHNICAL