The response deadline has passed. Review the details for future reference or to track similar opportunities.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govan upcoming requirement for paint and repairs to Water Tower #8. The general scope includes, but is not limited to, the inspection and repairs of the water tower and components, repairs of failing drain lines, disinfection of the tower tank, interior and exterior painting, and repairs to the existing safety climbing devices. The required end state is a fully operational water tower that is in compliance with all AWWA, OSHA, and UFC standards. The anticipated
period of performance is 90 calendar days beginning 10 days after contract award. Please note:
this is a sources sought notice for market research purposes only. This is not a formal solicitation. A solicitation will be posted on SAM.gov at a later date. If your firm is capable and interested in this requirement, please let us know by emailing TSgt Taylor Williams, [email protected], and Alice Townsend-Peden, [email protected], with the following: A brief statement of your capability to perform this work. 1. Your company's CAGE code, UEI, and business size/socioeconomic status. 2. Any standard spec sheets or brochures for the systems you might propose. TSgt Taylor Williams Alternative
Point of Contact Alice Townsend-Peden to this opportunity.
Get matched to contracts like this daily
Free AI-powered contract matching for your business.