The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring the replacement of HVAC systems at the 144th Fighter Wing at Fresno Air National Guard Base. This project includes the removal of existing units and installation of a new 40-ton HVAC system along with necessary ducting and electrical work, adhering to specific environmental constraints and security requirements. The contractor must ensure compliance with relevant directives and criteria during the execution of the project.
The contractor will remove existing HVAC units and install a new 40-ton HVAC system, ensuring compliance with environmental and security standards.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govSolicitation posted at: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S6T26BA019¬iceType=SolicitationNotice The 144th Fighter Wing at Fresno Air National Guard Base (ANGB) intends to award a single firm-fixed-price contract for non-personal construction services, to include all plant, labor, transportation, materials, tools, equipment, permits, and supervision necessary to remove four existing Heating, Ventilation, and Air Conditioning (HVAC) units and their auxiliary air ducting and electrical and drain lines. After all existing HVAC units have been removed, the contractor shall install a new 40-ton HVAC system, necessary ducting, electrical, and drain lines to provide for the following training equipment environmental constraints - Operating Temperature: 59 to 78 F, (15 to 26 C), Operating Humidity: 35% to 80% RH (non-condensing), Storage Temperature: 32 to 120 F, (-29 to 38 C), Storage Humidity: 20% to 80% RH (non-condensing). Services shall also include the removal and replacement of existing dust covers with custom-made roof adapters to transition from current ductwork in room serviced by the new packaged units. In order to maintain the existing security integrity of the building and comply with Intelligence Community Directive (ICD) Number 705, no new penetrations in the building are permitted. The Contractor must use existing penetrations to the maximum extent practicable. All work must also conform to Unified Facilities Criteria (UFC) 3-410-01. Site visit details are located at Section L - Instructions, Conditions, Notices to Offerors or Quoters as referenced on the SF 1442. A bid guarantee is required in accordance with provision 52.228-1 as referenced on the SF 1442. Justin Scales Alternative
Get matched to contracts like this daily
Free AI-powered contract matching for your business.