Closed
Save

Install Energy Management and Control Systems at ASOG Complex, Camp Murray

Department of Defense (DoD) > U.S. Army > JFHQ USPFO WAUSPFO
service contract
est. $792K – $29.1M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring services to install Energy Management and Control Systems (EMCS) at Building 140 of the ASOG complex at Camp Murray, WA. The contract includes a site visit and specific brand requirements for Siemens parts and services.

Generated 57d ago

Scope & Requirements

Install Energy Management and Control Systems (EMCS) at Building 140 of the ASOG complex at Camp Murray, WA, incorporating the building into the base Siemens controls.

Deliverables

  • Installation of EMCS
  • Incorporation of Building 140 into base Siemens controls
  • Submission of required documentation and drawings

Contract Details

Contract Type
service contract
Estimated Value
est. $792K – $29.1M
Similar contracts award $4K$473K (median $34K, 78,152 awards)Above typical range
NAICS Codes
Place of Performance
Camp Murray, WA, USA

Qualifications & Eligibility

Set-Aside Category
Small Business Set-Aside

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE ARMY NATIONAL GUARD BUREAU
Office
JFHQ USPFO WAUSPFO

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Site Visit3mo ago
Mar 3, 202610:00
Mandatory
Published3mo ago
Mar 16, 2026
Last Updated3mo ago
Mar 16, 2026
Offers Due3mo ago
Mar 18, 2026
Response Due2mo ago
Apr 3, 2026

Description

This is a service contract to install (Energy Management And Control Systems) EMCS at Bldg 140 the ASOG complex at Camp Murray, WA. There will be a site visit on Camp Murray WA on

03 Mar 2026 at 1000. For base access please complete https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page and see https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page . Contact [email protected] for base access

questions. Please note an update is forthcoming to include the HVAC asbuilts for the Bldg. On

26 Feb 2026 this was modified to include the drawings and the brand name J&A for Siemens parts and service to update the Bldgs. EMCS controls and incorporate the Bldg. into our base Siemens controls. Ammend 1 - update offers due date from

11 March 2026 to

18 March 2026. Add document "Camp Murray ASOG - Type B-3 - Volume 1 Drawings (Half Sized), G_23 05 93-1 TAB Shops - AF FORM 3000 Submittal_JV, G_230900-2 - Instrumentation & Control Product Data, and G_230900-2 Rev 1. 194th Contracting [email protected] to this opportunity. G-230900-2 - Instrumentation Control Product Data.pdf G_230900-2 Rev 1.pdf G_23 05 93-1 TAB Shops - AF FORM 3000 Submittal_JV.pdf Solicitation Amendment W50S9E26QA0010001 SF 30.pdf I.A.02 Limited Competition Justification EMCS KO signed.pdf Camp Murray ASOG Drawings.pdf Wage Determination 2015-5539 SCA

Get matched to contracts like this daily

Free AI-powered contract matching for your business.