Renovate Space to Meet Hazardous Storage Room Requirements - Veterans Affairs

Veterans Affairs (VA)
SDVOSB
est. $25K – $95K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The project involves renovating space to create a code-compliant, secure, negative-pressure Hazardous Drug Storage Room for the Department of Veterans Affairs. Key requirements include adherence to VA pharmacy safety, infection control, ventilation, and security standards, with a complete operational system to be delivered by the contractor.

Generated 56d ago

Scope & Requirements

The contractor is responsible for delivering a complete, operational, and code-compliant Hazardous Drug Storage Room, including site verification, demolition, construction, and various system installations.

Deliverables

  • Complete operational Hazardous Drug Storage Room
  • As-builts
  • O&M manuals
  • Warranties

Contract Details

Estimated Value
est. $25K – $95K
Similar contracts award $25K$400K (median $99K, 73,582 awards)Within typical range
NAICS Codes
Set-Asides
SDVOSB

Qualifications & Eligibility

Set-Aside Category
SDVOSB

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Apr 8, 2026
Last Updated2mo ago
Apr 8, 2026
Became Sources Sought2mo ago
Apr 8, 2026
Tracked
Became Solicitation2mo ago
Apr 8, 2026
Tracked
Response Due1mo ago
Apr 24, 2026

Description

The intent of this project is to provide a code-compliant, secure, negative-pressure Hazardous Drug Storage Room that meets VA pharmacy safety, infection control, ventilation, and security

requirements. The Contractor shall deliver a complete, fully operational, tested, and accepted system. Work that is reasonably inferable from the Contract Documents shall be included, whether every individual component is explicitly shown. By submission of a bid, the Contractor acknowledges that it has reviewed, coordinated, and understood all Contract Documents, including drawings, specifications, design narrative, phasing

requirements, and VA operational constraints. The Contractor is fully responsible for delivering a complete, operational, and code-compliant project, including Site verification and coordination, Demolition and construction, Mechanical, electrical, fire protection, and security systems, Controls and BMS coordination, Testing, TAB, and commissioning support, ICRA, PCRA, and ILSM implementation, Temporary facilities, barriers, and protections, Final cleaning, as-builts, O&M manuals, and warranties. Stacie I Hill to this opportunity. 36C25026B0025 0002.pdf Pre-Bid Site Visit Presentation - 583-24-527.pptx Pre-Bid Site Visit Sign-In - 583-24-527.pdf 36C25026B0025 0001.pdf ATTACHMENT V - RFI Form.docx ATTACHMENT IV - Instructions for VAAR 852.219-75.docx ATTACHMENT III - WD.pdf ATTACHMENT II - COMBINED_SPECS_583-24-527.pdf