The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.
The City is procuring the demolition of a playground zipline. The project requires the safe removal of the zipline structure and associated components, ensuring the area is left clean and safe for future use.
Get your fit score, win probability, and required capabilities.
1.0 DISCLAIMER This Sources Sought is for informational and market research purposes only in accordance with FAR Part 10. THIS IS NOT A REQUEST FOR PROPOSAL (RFP), REQUEST FOR QUOTATION (RFQ), OR INVITATION FOR BID (IFB). This notice does not constitute a commitment by the Government to issue a solicitation or award a contract. The Government will not pay for any effort expended or any material provided in response to this announcement. Note: Any future solicitation may be issued subject to the Availability of Funds (FAR 52.232-18). 2.0
OBJECTIVE The 766th Enterprise Sourcing Squadron (766 ESS) is conducting market research to identify potential and eligible small business sources capable of performing specialized demolition and site restoration at the "Field of Dreams" playground located between Vickers and Worthington on JBPHH. The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to perform the following: Remove all zip line equipment. Cut equipment at the top of the concrete footer OR remove surface mount bolts and anchors. Ensure existing concrete footers, safety surfacing, and curbing remain intact and undamaged. Reinstall foam/buffings underlayment to restore site integrity. Patch specialized turf surfacing to provide a smooth surface completely free of tripping and fall hazards in accordance with the Consumer Product Safety Commission (CPSC) Public Playground Safety Handbook. Remove and properly dispose of all demolished and scrap materials off the installation. 3.0 SUBMISSION INSTRUCTIONS Interested firms are requested to complete the attached Capability Statement (Attachment 1). Responses should clearly demonstrate the firm's experience with precision demolition and specialized playground safety surfacing. Page Limit: Maximum of five (5) pages. Format: PDF or Microsoft Word. Dominick Dockery to this opportunity. Field of Dreams Zip Line Removal - SOW.docx
Get matched to contracts like this daily
Free AI-powered contract matching for your business.