Closed
Save

Repair and Maintain Kelbaker, Kelso-Cima, Cima, and Morning Star Mine Roads

Dept. of TransportationSol: 6982AF25B000013
HUBZoneFFP
$32K – $465K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Transportation is procuring improvements to approximately 56.5 miles of roads within the Mojave National Preserve in San Bernardino County, CA, aimed at enhancing safety and visitor access. Key requirements include resurfacing, restoration, and rehabilitation of roads, with specific tasks such as full depth reclamation, roadway widening, and reinforcing low water crossings. The estimated cost for the project ranges from $80,000,000 to $120,000,000, and prior experience on similar projects is required.

Generated 28d ago

Scope & Requirements

The project involves significant road improvements including resurfacing, restoration, and rehabilitation of multiple roads within the Mojave National Preserve.

Contract Details

Contract Typei
FFP
Contract Value
$32K – $465K per task order
IDIQ ceiling: $120M
Similar contracts award $32K$465K (median $129K, 8,020 awards)
NAICS Codes
Place of Performance
Lakewood, CO, USA
Set-Asides
HUBZone

Qualifications & Eligibility

Set-Aside Category
HUBZone
Past Performance
Prior experience on projects of similar magnitude.

Agency & Contact

Contracting Organization

Agency
TRANSPORTATION, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published29d ago
May 6, 2026
Became Solicitation28d ago
May 6, 2026
Tracked
Last Updated28d ago
May 7, 2026
Response Due20d ago
May 14, 2026

Description

PLANS AND SPECIFICATIONS ARE AVAILABLE. CA NP MOJA 11(2) 10(2) KELBAKER, KELSO-CIMA, CIMA and MORNING STAR MINE ROADS FULL AND OPEN COMPETITION WITH HUBZone PRICE PREFERENCE PROJECT DETAILS: The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access. Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road. The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with riprap revetment. The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection, The estimated cost for the work is between $80,000,000 and $120,000,000. The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude in is required. Principle work items include: 110,000 tons of asphalt concrete pavement, 133,000 tons of roadway aggregate, 81,000 tons of aggregate surface course, 110,000 cubic yards of roadway excavation, 49 miles of full depth reclamation, method 2, 6-inch depth, 17,000 linear feet of concrete barrier (low water crossings), 44 miles of fence, tortoise barrier, 2,400 linear feet of tortoise crossing structure, and 12,000 cubic yards of rip rap Jorey Deml Contracting . DAKOTA AVE (No Street Address

2) LAKEWOOD, CO 80228 USA

Get matched to contracts like this daily

Free AI-powered contract matching for your business.