The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring the construction of the F-35 Aircraft Sustainment Center and Composite Repair Facility at Marine Corps Air Station Cherry Point, NC. This project includes a 255,461 square foot hangar for maintenance of 20 F-35 aircraft, along with a 105,755 square foot facility for advanced composites and rotor blade repair, featuring various specialized areas for aircraft maintenance and repair operations.
Two (2) offerors have been pre-qualified for Segment II.
The offerors for Segment II are ECC Atlantic Construction and Walsh Federal.
The F35 Sustainment Center is a 255,461 SF depot level hangar to support (20) F-35 aircraft.
In addition to the hangar maintenance bays, the project will also include 4 paint booths, administrative space, aircraft part modification and tool shops, and a secure area built to ICD705 standards.
The main facility is a precast structural concrete panel with a pile supported foundation, slab on grade, and cross laminated timber roof deck.
The structure is a single story with a two-story administrative space.
Get matched to contracts like this daily
Free AI-powered contract matching for your business.