Lock Foundation and Site Preparation for Lock and Dam 25

Department of Defense (DoD) > U.S. Army > St. Louis District
TBD
est. $25M – $45M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring construction services for the Lock Foundation and Site Preparation for Lock and Dam 25 as part of the Navigation Ecosystem Sustainability Program. Key requirements include excavation, dredging, and the construction of a separator wall and deflector, along with site preparation activities for staging and laydown areas. Proposals must be submitted via email to specified contacts by the stated deadlines.

Generated 30d ago

Scope & Requirements

The work involves lock foundation and site preparation activities including excavation, dredging, and construction of necessary structures for the Lock and Dam.

Contract Details

Contract Type
TBD
Estimated Value
est. $25M – $45M
Similar contracts award $44K$1.1M (median $204K, 8,719 awards)Above typical range
NAICS Codes

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
U.S. Army Corps of Engineers
Office
St. Louis District

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Mar 28, 2026
Last Updated2mo ago
Mar 28, 2026
Became Award Notice2mo ago
Mar 28, 2026
Tracked
Became Solicitation2mo ago
Mar 28, 2026
Tracked
Became Sources Sought2mo ago
Mar 28, 2026
Tracked
Became Presolicitation2mo ago
Mar 28, 2026
Tracked
Became Special Notice2mo ago
Mar 28, 2026
Tracked
Response Due2mo ago
Mar 31, 2026
ProjNet Bidder Inquiries Re-opened2mo ago
Apr 3, 202616:00

Description

This amendment is issued to provide replies to ProjNet Bidder Inquiries, and make all resulting changes. ProjNet Bidder Inquiries is re-opened through 4:00pm CST,

3 April 2026. There are some

attachments that must be requested in order to be provided via DoD SAFE. See

attachments for full details of amendment 0003. Amendment 0002 This amendment is hereby issued to make administrative updates to the above-referenced solicitation in accordance with the Government Responses to ProjNet Bidder Inquiries as of

4 March 2026: Amendment 0001 This amendment is issued to make administrative updates to the solicitation. Proposal will be submitted via EMAIL Angie Grimes at [email protected] and Whitney Dee at [email protected] The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed. Angie Grimes Alternative

Point of Contact Whitney Dee to this opportunity. Solicitation Amendment W912P926RA0010003 SF 30.pdf B3MRLD25202402-PLAN_SET_AMND-2026-03-27-Amendment 0003 Plans.pdf ProjNet Bidder Inquiries and Government Replies as of