Closed
Save

Shipping And Storage Containers For Department Of Defense

Department of Defense (DoD) > Defense Logistics Agency (DLA) > DLA AVIATIONSol: SPRPA126RVA96

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring shipping and storage containers, specifically requiring rotomolded plastic materials and compliance with various military standards. Key requirements include the use of desiccants, specific finishes, and unique identification markings on each container.

Generated 61d ago

Scope & Requirements

The contractor is responsible for manufacturing, testing, and inspecting shipping and storage containers according to specified military standards and requirements.

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Estimated Value
Not specified
Similar contracts award $2K$39K (median $10K, 6,326 awards)
NAICS Codes
Place of Performance
PHILADELPHIA, PA, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEFENSE LOGISTICS AGENCY
Office
DLA AVIATION

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Mar 30, 2026
Last Updated2mo ago
Mar 30, 2026
Became Solicitation2mo ago
Mar 30, 2026
Tracked
Response Due2mo ago
Apr 10, 2026

Description

(JAN 2023)|19|||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD||TBD|TBD|TBD|TBD|TBD|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| 1. SCOPE 1.1 / POST AWARD

REQUIREMENTS: Due to the critical use of this item and its quality history, a survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.2 Container shell material is ;Plastic; . 1.3 Manufacturing process is ;Rotomolded; . 1.4 When discrepancies exist between these

requirements and those on current manufacturer's drawings,contact code ;Contact buyer on page 1 of contract; or code N241.10 1.5 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Hardigg; drawing number ( ;11214; ) ;16573-0100, Revision ;latest; and all details and specifications referenced therein. 1.6 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.7 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | 3.

REQUIREMENTS 3.1 One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment. 3.2 Reference to Cadmium plating shall be deleted and the following substituted: "Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3." All containers must be affixed with a nameplate that includes a Unique Identification (UID) marking as referenced in the drawing package Drawing ;(80132) 15930; and IAW Mil-STD-130 latest revision. The contractor shall contact NAVICP code ;contact buyer found on page 1 of the contract; or code 0771.10 for the alphanumeric sequential serial number group that makes up part of the UID. The UIDwill be included on the nameplate in data matrix format. Contact code ;contact the buyer found on page 1 of the contract; or code N241.10 to arrange for First Article Test location When a First Article is required, the contractor shall submit a paper copy of the drawings (size 11" X 17"), contracts and approved ECP's ECO's, deviations waivers, and modifications in the records recepticle or inside the container submitted for the First Article. Each container shall be assigned a serial number using the following convention, "contract#_no_dashes-000X". For example, "SPRPA125CEG35-0001", "SPRPA125CEG35-0002", and so on. 4. QUALITY ASSURANCE 4.1 Unless otherwise provided for in the contract, sample(s) shall be returned to the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMAO QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.2 The tests to be performed under the First Article approval clause (FAR 52.209-4) of the contract are listed below. 4.2.1 Dimensional test (special) ;to drawing (11214) 16573-0100 and applicable sub drawings is applicable; 4.2.2

Requirements of: ;to drawing (11214) 16573-0100 and sub0drawings is applicable; 4.2.3 Form: ;applies; 4.2.4 Fit: ;applies; 4.2.5 Function ;applies; 4.2.6 Compliance with drawing ( ;11214; ) ;16573-0100, Revision ;latest; and specifications referenced therein. 4.3 In addition to the above tests, the First Article(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with contract

requirements

Get matched to contracts like this daily

Free AI-powered contract matching for your business.