The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring the construction and renovation of the Fuel Laboratory Facility at MCAS Miramar. Key requirements include the demolition of the existing structure, complete renovation, and adherence to environmental considerations to prevent pollution during construction operations.
This project involves the demolition and renovation of the Fuel Laboratory Facility at MCAS Miramar, focusing on environmental protection during construction.
This project consists of demolition and construct/renovate the Fuel Laboratory Facility 9647 (CLIN 0001). The existing structure is in relatively good condition, therefore the building will be completely renovated. Environmental considerations of this project includes demolition with hazardous building materials survey and abatement. Prevent environmental pollution and damage that may occur as a result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work must be protected during the entire duration of this contract. Steven Engen Alternative
Point of Contact Robert Ragos to this opportunity. Attachment E - RFP Drawings.pdf DRAFT_Attachment D - Technical
Scope of Work.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.