Vehicle Recovery Range Construction

Department of Defense (DoD) > U.S. Army > Engineer Division North Atlantic District NorfolkSol: W9123626BA006
8(a)FFP
est. $450K – $1.2M
Quick Brief

The Department of Defense is procuring construction services for the Fort Lee Vehicle Recovery Range project, which involves building 24 concrete turning pads along with necessary site drainage improvements and road alignment. The project will be executed in three phases, with specific requirements for excavation, concrete placement, and storm drainage systems to ensure proper site integration and functionality.

Generated 35d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The work involves constructing concrete turning pads and related site improvements, including drainage and road alignment, executed in three phases with specific access and completion requirements.

Contract Details

Contract Typei
FFP
Estimated Value
est. $450K – $1.2M
Similar contracts award $25K to $402K (median $99K, 70,896 awards)Above typical range
NAICS Codes
Set-Asides
8(a)

Qualifications & Eligibility

Set-Aside Category
SDVOSB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division North Atlantic District Norfolk

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
Jun 18, 2026
Became Solicitation1mo ago
Jun 18, 2026
Tracked
Last Updated1mo ago
Jun 20, 2026
Response Duein 4d
Jul 28, 2026

Description

The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings. Contractors should review and follow all bid instructions listed in the solicitation. Site Visit information will be provided in an upcoming amendment to the solicitation.

Questions are to be submitted using ProjNet. Bids are to be submitted on the PIEE web site. See web site link within this notice to access PIEE. Michael Stevenson Phone Number (757) 201-1355 Alternative

Point of Contact Michael Hagerty Phone Number (757) 201-7303