The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring a Roller Guide Assembly for the Navy. Key requirements include adherence to specific drawings and regulations, government source inspection, and manufacturing in compliance with specified standards.
Manufacture of the Roller Guide Assembly in accordance with specified drawings and regulations.
|4|N97113A|FEB|771-229-0509|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|TBD|N/A|N/A|N/A|N/A|N/A|[email protected]| NOTE FOR CONTRACTOR/ADMINISTRATIVE
CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|336313|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| TDP and Bidset updated. Updated official remarks are listed below. P/N: 5650720 (ROLLER GUIDE ASSY) CAGE CODE (53711) MUST BE MANUFACTURED INADHERENCE TO REGS/SPECS WITHIN DRAWING 5650720 REV_B & DRAWING 5650723 REV_F All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electrocommercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. RFQ closing date has been extended until COB,
21 NOV 2025. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electrocommercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. TO VIEW THE DRAWINGS: Go to www.https://beta.sam.gov/ Click: Contract Opportunities and enter the solicitation number. This gives you access to the Electronic Solicitation. Drawings can be viewed or downloaded. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY_______________DAYS. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture of the ROLLER GUIDE ASSEMB . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the drawings shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=56292 |53711| H|OD |D| | | | DRAWING DATA=5650720 |53711| B|DW |D| | | | DRAWING DATA=5650721 |53711|A1|DW |D| | | | DRAWING DATA=5650722 |53711|B1|DW |D| | | | DRAWING DATA=5650723 |53711|F3|DW |D| | | | DRAWING DATA=5650723 |53711| -|1N |D| | | | DRAWING DATA=5656985 |53711| A| |D| | | | DRAWING DATA=56778 |53711| -|OD |D| | | | DRAWING DATA=9412 |10001| -|WS |D| | | | 3.
REQUIREMENTS 3.1 Manufacturing and Design - The ROLLER GUIDE ASSEMB furnished under this contract/purchase order shall meet the material and physical
requirements as specified ;P/N: 5650720 (ROLLER GUIDE ASSY) CAGE CODE (53711) MUST BE MANUFACTURED IN ADHERENCE TO REGS/SPECS WITHIN DRAWING 5650720 REV_B & DRAWING 5650723 REV_F; . 3.2 Marking - Unless marking
Get matched to contracts like this daily
Free AI-powered contract matching for your business.