Repair and Replace Hangar Roof at Building 11525

Department of Defense (DoD) > U.S. Air ForceSol: FA500026Q0025
SBFFP
est. $26K – $368K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring the repair and replacement of the hangar roof at Building 11525, JBER, Alaska. The project involves removing the existing built-up roof and replacing it with new roofing assemblies, including SBS-Modified BUR and EPDM, along with necessary updates to roof drains and flashings. A site visit is scheduled for June 8, 2026, at 12:00 PM.

Generated 21d ago

Scope & Requirements

The project involves the repair and replacement of the hangar roof at Building 11525, including the removal of the existing roof and installation of new roofing assemblies.

Contract Details

Contract Typei
FFP
Estimated Value
est. $26K – $368K
Similar contracts award $26K to $369K (median $93K, 3,051 awards)Within typical range
NAICS Codes
Place of Performance
JBER, Alaska, USA
Set-Asides
SB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
PACIFIC AIR FORCES

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Site Visit2mo ago
Jun 8, 202612:00 PM
Published23d ago
Jul 2, 2026
Became Solicitation22d ago
Jul 2, 2026
Tracked
Last Updated20d ago
Jul 4, 2026
Response Due17d ago
Jul 7, 2026

Description

for 8 June, 2026, at 12:00PM. Building 11525 is a one-story, 113,000 square feet (SF) building framed from steel and cast concrete (beams and columns with CMU infill). The building was originally constructed in the early 1940s and is a historic property. The high barrel roof section that?s approximately 200-ft (curved) by 280-ft, two low roof low sections that are approximately 35-ft by 280-ft each, and one low roof section that approximately 62 ft by 242 ft. This project will remove the existing built-up roof (BUR) from both barrel center section and the east side roof low section identified in Sheets AD-101 and A-101, down to the existing decking and replaced with new 3-ply SBS-Modified BUR roof assembly with granular cap sheet on the barrel roof section and the south lower roof low section shall be replaced with a new 90-mil Ethylene Propylene Diene Monomer (EPDM) roof assembly. All roofing assemblies shall be fully adhered. Replace existing roof drains, flashings, vent pipe flashing, cover board (as required), vapor barrier, cant strips, metal copings and trim with new. Christopher Nelson Alternative