11 MAY 2026 AT 2:30 P.M. EST PLEASE NOTE THE RFI RESPONSES, SITE PICTURES, AND DRAWINGS THAT HAVE BEEN INCORPORATED --> ADDITIONALLY TAKE NOTE THAT: The LA-1050 Top Loading oven dimensions are: 69" x 97" x 60". Weight is 5,865 lbs. Contractor to provide the design, materials, installation, workmanship, fabrication, assembly, erection, inspection, quality control, and testing of a new structural steel flooring system required to support manufacturing equipment in Building 35 at the Watervliet Arsenal (WVA). All work to be conducted in accordance with the Statement of Work (see section J of the solicitation). Wage Determination General Decision Number: NY2 Latest Reviison applies and is incorporated. Magnitude of the project is between $25,000 and $100,000.
Period of performance is 90 days from issuance of Notice to Proceed. 100% Payment (and Performance if price is over $150k) bonds are required. Solicitation is set-aside for small business and will result in a firm fixed-price contract. Site visit will be conducted on
28 April 2026 @ 2:00pm. See page 3 of solicitation for further details. Maria DeCrescenzo to this opportunity. a6514b90-7a7f-4507-aa18-ccad6d7a6360.jpg IMG_0494.jpeg IMG_0495.jpeg IMG_0484.jpeg IMG_0490.jpeg IMG_0491.jpeg IMG_0487.jpeg IMG_0488.jpeg IMG_0486.jpeg IMG_0489.jpeg IMG_0482.jpeg IMG_0493.jpeg IMG_0485.jpeg IMG_0483.jpeg RFI RESPONSES.docx Minor Heat Treat Floor Service SOW.docx
Get matched to contracts like this daily
Free AI-powered contract matching for your business.