Closed
Save

Oil Water Separator Design and Installation

Department of Defense (DoD) > U.S. Air Force > AIR COMBAT COMMAND
WOSBSealed Bidding
est. $200K – $500K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring the design and installation of a 300 GPM oil water separator to capture and remove hydrocarbons from the sanitary waste stream at Building 270. The project includes excavation, plumbing, electrical work, and commissioning, with additional FOD prevention measures.

Generated 57d ago

Scope & Requirements

The project involves installing a 300 GPM oil water separator to capture and remove hydrocarbons, including excavation, plumbing, electrical work, and commissioning, with additional FOD prevention measures.

Deliverables

  • Design and installation of a 300 GPM oil water separator
  • Excavation, shoring, and foundations
  • Plumbing and site electrical work
  • Controls/alarms work and commissioning
  • Real-time monitoring sensors

Evaluation Criteria

  1. Technical Approach
  2. Past Performance
  3. Price

Contract Details

Contract Type
Sealed Bidding
Awarded Amount
est. $200K – $500K
Similar contracts award $44K$1.1M (median $204K, 8,719 awards)Within typical range
NAICS Codes
Set-Asides
WOSB

Qualifications & Eligibility

Set-Aside Category
WOSB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE AIR FORCE
Office
AIR COMBAT COMMAND

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Apr 1, 2026
Last Updated2mo ago
Apr 1, 2026
Became Award Notice2mo ago
Apr 1, 2026
Tracked
Response Due2mo ago
Apr 3, 2026
Site Visit Information Submission Deadline2mo ago
Apr 9, 202612:00 PM
MDT
Site Visit2mo ago
Apr 16, 202610:00 AM
MDT, Mandatory

Description

The

objective of this project is to install a gravity fed, 300 gallon per minute (GPM) oil water separator (OWS) to capture and remove 99% of free and dispersed hydrocarbons larger than 20 microns, with integrated sensors for real-time monitoring. The government is pursuing the installation of this OWS due to observed hydrocarbons entering the sanitary waste stream from building 270. The work involves but is not limited to excavation, shoring, foundations, plumbing, site electrical work, controls/alarms work, and commissioning. Additionally, the facility this will be serving is located on the airfield and will require extra precautions to prevent foreign object debris (FOD) from being generated and will require additional screening of personnel working on this project. This acquisition is being conducted using the Two-Step Sealed Bidding procedures. •Step 1 (This RFTP): Interested offerors shall submit an unpriced technicalproposal that directly addresses the

requirements and

evaluation criteria outlinedin this document. The Government will evaluate these proposals to determinewhich offerors have a high probability of successful performance. No

pricinginformation of any kind shall be submitted in Step 1. •Step 2 (Invitation for Bids): Offerors whose technical proposals are determined tobe acceptable in Step 1 will be invited to submit a sealed price bid for the project.The contract will be awarded to the responsible bidder who submitted the lowest-priced bid in Step 2. Site Visit Date/Time: April 16, 2026, 10:00 AM MDT. Site visit information requests such as base access procedure or additional site visits shall only be submitted in writing to the CONS POCs. Site visit attendees must submit full names, driver’s license numbers and state of issue, company name, and vehicle type (personal or commercial vehicle), for all attendees, to the CONS POCs no later than 12:00 PM MDT on April 9, 2026. For further infomation, please refer to the RFTP attached in the solicitation. Gage Bergman Alternative

Point of Contact SrA Deivid Baez to this opportunity. Attachment 4 OWS Hush House - Utility Area Map.pdf Attachment 1 FA489726B0004 - Clauses.pdf STEP 1 Request for Technical Proposals - FINAL.pdf Attachment 5 - 01 57 19 Temp Environmental Controls_MHAFB Env Spec.pdf Attachment 2 SOW-OWS.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.