Repair Base Perimeter Road at Selfridge Air National Guard Base

Department of Defense (DoD) > U.S. Army > JFHQ USPFO MIUSPFO MISol: W50S8526BA001
SBFFP
est. $32K – $467K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring construction services for the repair of the base perimeter road at Selfridge ANGB. The project involves full-depth pavement repairs, mill/overlay, crack repairs, and installation of subsurface edge drainage along approximately 4.2 miles of road, requiring coordination with Base Operations and compliance with a Macomb County Soil Erosion Permit. Contractors must maintain traffic flow during construction and adhere to updated project specifications and drawings.

Generated 28d ago

Scope & Requirements

The work includes the construction of new 2 and 3 lane roads, full-depth pavement repairs, and localized grading to improve drainage.

Contract Details

Contract Typei
FFP
Estimated Value
est. $32K – $467K
Similar contracts award $32K to $473K (median $130K, 7,685 awards)Within typical range
NAICS Codes
Place of Performance
Selfridge
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
SDVOSB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE ARMY NATIONAL GUARD BUREAU
Office
JFHQ USPFO MIUSPFO MI

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Site Visit2mo ago
Jun 3, 202614:00
Mandatory, base access request forms due 4 days prior
Additional Site Visit1mo ago
Jun 11, 202611:00
Mandatory, base access request forms required
Published1mo ago
Jun 25, 2026
Became Solicitation29d ago
Jun 25, 2026
Tracked
Last Updated28d ago
Jun 26, 2026
Bid Due Date25d ago
Jun 30, 202614:00
Please acknowledge amendment 0004 when submitting bid
Response Due24d ago
Jun 30, 2026

Description

The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the

requirements found in the specifications, in which case, the more stringent/higher quality

requirements will apply. All work will be coordinated with Base Operations. A Macomb County Soil Erosion Permit will be required for this project. The Contractor shall obtain, pay for, and follow the

requirements of this permit. The work will consist of Construction of new 2 and 3 lane roads. The requirement includes full-depth pavement repairs, mill/overlay, crack repairs, and work along the entire Perimeter Road and Jefferson Ave. All work will be completed IAW drawings Repair Perimeter Rd VGLZ 182035. Installation of subsurface edge drainage for all new pavement sections. Localized grading of the project site to address current inadequate drainage. New paint and markings on all new pavements. The Contractor must maintain a constant flow of traffic during construction. Base perimeter road surfacing to be primarily of HMA Pavement. Existing base perimeter road distance to be resurfaced unofficially is 4.2 miles of primarily two and three lane road, with Jefferson Ave from Main Gate to Wilbur Wright Blvd. being three lanes. Those three lanes make up one mile of the projects 4.2 total miles. Contractor to remove and reinstall steel wedge barriers and jersey barriers throughout construction per the direction of SANGB Security Staff. Steel barriers to be reinstalled at grade to match pre-construction condition. (See

attachments for further information to include base access request form) Base access request form and RFIs can be sent to David Brown at [email protected]. Base access form PW is 127sfs. Site visit will be held on Wednesday

3 June 2026 at 2:00pm EDT. Please have base access request forms in NLT 4 days prior to site visit. Update