The response deadline has passed. Review the details for future reference or to track similar opportunities.
NIST Boulder is seeking a contractor to replace an existing laboratory fume hood and associated rooftop exhaust system in Building 2, Room 1330. The project includes demolition, installation of a new walk-in fume hood, and various modifications to support new research.
Replacement of an existing laboratory fume hood and associated rooftop exhaust system, including demolition, installation of a new walk-in fume hood, and various modifications to support new research.
The National Institute of Standards and Technology (NIST), Boulder, Colorado, is seeking information from qualified contractors capable of performing construction services for the replacement of an existing laboratory fume hood and associated rooftop exhaust system in Building 2, Room 1330 at the NIST Boulder Campus (325 Broadway, Boulder, CO). The project includes demolition and replacement of an existing tabletop fume hood installed in 1992 with a new walk-in fume hood and hazardous exhaust fan to support new research involving larger equipment and toxic gases. Work will include architectural, mechanical, plumbing, electrical, and fire alarm modifications, including removal and replacement of countertops, sink, plumbing connections, ductwork, rooftop exhaust fan, electrical circuits, cable tray, lightning protection connections, and installation of a panic alarm system integrated with the building fire alarm system. The contractor will also provide structural design and installation of exhaust stack supports, perform ASHRAE 110 performance testing of the hood and exhaust system, and coordinate construction activities with NIST personnel. The anticipated
period of performance is approximately six months from the date of award. Lauren Lopez Alternative
Point of Contact Travis Zoellner Contracting . GAITHERSBURG, MD 20899 USA to this opportunity. SS Notice.docx 01 B2 1330 Fume Hood Replacement SOW.docx 01A NIST Boulder General Contractor
Requirements - Rev C.docx 01C B2 1330 Fume Hood Replacement.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.