Construction of Chilled Water Replacement and Site Utility Improvements

Department of Defense (DoD) > Veterans Affairs (VA) > U.S. Army Corps of Engineers, New England District
FFP
$26K – $415K per task order
Quick Brief

The U.S. Army Corps of Engineers is procuring construction services for the replacement of the chilled water plant and site utility improvements at the Department of Veterans Affairs campus in West Haven, CT. This project aims to enhance the campus infrastructure by upgrading existing utilities and constructing a new chilled water plant to support clinical operations. The estimated construction cost ranges from $40 million to $115 million, with a performance period of 3.5 years.

Generated 9d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The project involves the demolition of the existing chilled water plant and construction of a new facility, along with site utility upgrades to enhance the infrastructure at the VA campus.

Contract Details

Contract Typei
FFP
Contract Value
$26K – $415K per task order
IDIQ ceiling: $115M
Similar contracts award $26K to $415K (median $100K, 70,869 awards)
Period of Performance
3.5 years
NAICS Codes
Place of Performance
West Haven, CT, USA

Qualifications & Eligibility

NAICS Size Standard
$45M

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
Department of Veterans Affairs
Office
U.S. Army Corps of Engineers, New England District

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published11d ago
Jul 13, 2026
Last Updated11d ago
Jul 13, 2026
Became Solicitation10d ago
Jul 13, 2026
Tracked
Anticipated Issuance Datein 8d
Aug 1, 2026
Response Duein 20d
Aug 13, 2026
Anticipated Award Datein 9mo
May 1, 2027

Description

The U.S. Army Corps of Engineers, New England District (CENAE) will be issuing a Best Value Trade-Off (BVTO) Request for Proposal (RFP) for the Design-Bid-Build construction of the Chilled Water Plant Replacement and Site Utility Improvements at the Department of Veteran Affairs (DVA) campus in West Haven, CT. This will be an unrestricted RFP procurement. The NAICS code for this procurement is 236220 with a size standard of $45M. The estimated construction cost is between $40,000,000 and $115,000,000.00. The project is planned to be issued on or about August 2026 with award anticipated late-Spring 2027. The

period of performance is 3-1/2 years. Project Information: VA Connecticut Healthcare System (VACHS) was officially formed in 1995 with the integration of the VA medical centers in West Haven and Newington. VACHS serves Veterans in Connecticut and southern New England. The West Haven campus, located at 950 Campbell Avenue in West Haven, CT is a tertiary care facility classified as a Clinical Referral Level One Facility. The VA uses Strategic Capital Investment Planning (SCIP) process to prioritize construction projects that are needed to meet changing demand for services, improve aging infrastructure, and to keep pace with changing technology and models of care. The VACHS developed a Business Case as part of the 2018 (updated in

2020) SCIP process in support of a new surgical and clinical space construction project to address critical deficiencies related to utility failures, infection prevention issues, patient and staff safety concerns, and space constraints. The project, titled Construct New Surgical and Clinical Space Tower, Demolish Bldg. 7, 8, 8.5, and 9 (SCIP Project Number VHA1-689-2018-33888) and VA specific project number 689-040 represents a multi-phase, complex VA Major Construction project which is intended to upgrade and consolidate existing clinical and direct patient care spaces to current standards of patient care. Phase A2 consists of the demolition and replacement of the existing chilled water plant and construction of site utility upgrades which will improve the campus infrastructure by providing new and redundant utilities to serve the campus as well as new chilled water plant with sufficient capacity to support existing campus and new Surgical/Clinical Tower loads. The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chillers, cooling towers, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjacent to the existing chilled water plant, a new fuel tank farm will need to be constructed as part of the project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing related projects. The scope of the site utility upgrades consists of the replacement and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15. Site utility upgrades also include providing utility main loops of chilled water supply and return, steam supply, condensate return, domestic water supply, and fire protection water supply which will originate from the new chilled water plant and back-feed to Building 1. The work also includes the installation of redundant electrical feeder from the utility demarcation point to Building 19 and coordination with the local electrical utility provider to provide further electrical redundancy offsite as well. In addition, new water storage tanks will be constructed. This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. The project must also comply with the DVA’s Physical Security Resiliency Design

Requirements (PSRDM). It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification. The work is located adjacent to and within an active Medical Center campus which will be operational at all times. Impact to on-going operations must be kept to a minimum and carefully coordinated with the

Contracting Officer and VAMC staff. In addition, the work area is constrained due to the active medical center operations which will limit laydown and storage areas during construction. This is not a request for proposal at this time. The solicitation

requirements and contract documents to include instructions for submission and the response date will be available on or about August 2026. Neither telephonic, mailed, nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to view the solicitation offerors must access the System for Award Management website (www.sam.gov). In order to download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the USACE New England District. Additional