Closed
Save

Circuit Card Assembly

Department of Defense (DoD) > NavsupSol: N0010426QYA8T
FFP
est. $15K – $40K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring circuit card assembly services for the Navy, specifically focusing on the repair and quality requirements of electronic assemblies and associated hardware. Key requirements include a repair turnaround time of 226.25 days after receipt of assets and adherence to specific throughput constraints for monthly repairs.

Generated 28d ago

Scope & Requirements

The contractor will be responsible for the repair of circuit card assemblies, ensuring compliance with the established quality and turnaround time requirements.

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Typei
FFP
Estimated Value
est. $15K – $40K
Similar contracts award $5K$77K (median $18K, 6,212 awards)Within typical range
NAICS Codes

Qualifications & Eligibility

Set-Aside Category
Total Small Business
NAICS Size Standard
750

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
NAVSUP

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published29d ago
May 6, 2026
Became Solicitation28d ago
May 6, 2026
Tracked
Last Updated28d ago
May 7, 2026
Response Due8d ago
May 26, 2026

Description

|4|N741.P13|N00104|1 771-229-0591|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|invoice and receiving reports (combo)||n/a|n00104|n/a|n/a|n/a|n/a|||n/a|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor's facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular businessday after receipt and the Action Date entered in CAV must be dated to reflectthe actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in the subsequent contract. Required RTAT: 226.25 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint foreach NSN(s). Total assets to be repaired monthly after initial deliverycommences X/month (contractor fill in #). A throughput of ##____ per monthreflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any assetreceived after this date in days is not authorized for repair withoutbi-lateral agreement between the Contractor and NAVSUP WSS ContractingOfficer. All contractual documents related to the instant procurement are considered tobe "issued" by the Government when copies are either deposited in the mail,transmitted by facsimile, or sent by other electronic commerce methods, such email. The Governments acceptance of the contractors proposal constitutesbilateral agreement to "issue" contractual documents as detailed herein. KA10Y clause gone need to input clauseAccording to FAR 52.204-8:(1)The North American Industry System (NAICS) code for this acquisition is 334412. (2) The small business size standard is 750. \ 1. SCOPE 1.1 This contract/purchase order contains the

requirements for repair and the contract quality

requirements for the CIRCUIT CARD ASSEMB . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | 3.

REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CIRCUIT CARD ASSEMB repaired under this contract/purchase order shall meet the operational and functional

requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;04804 2051F54G01; 3.2 Marking - This item shall be physically identified in accordance with MIL-STD-130. 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH

Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement

Get matched to contracts like this daily

Free AI-powered contract matching for your business.