The response deadline has passed. Review the details for future reference or to track similar opportunities.
The U.S. Department of Agriculture is contracting for the replacement and repair of dam valve assemblies at the Hoosier National Forest. The work involves replacing valve assemblies at Celina Lake and Saddle Lake dams, and repairing the valve assembly at the U-38 dam. This project is set aside for small businesses under FAR 19.5.
The project involves the replacement of dam valve assemblies at two lakes and the repair of a valve assembly at a third dam within the Hoosier National Forest.
The Hoosier National Forest has three earthen dams that have maintenance needs with their valve operations. These dams are located on the Tell City Ranger District (See attached maps for locations and directions). The existing valve systems for all three dams are different. Known equipment and diagrams for each dam have been included in
attachments to this solicitation. A copy of the as-builts can be acquired upon request. The
scope of work includes the replacement of the dam valve assemblies at Celina Lake and Saddle Lake dams, and the repair of the dam valve assembly at the U-38 dam located on the Hoosier National Forest Jordan Wheelock Contracting (No Street Address
2) Atlanta, GA 303092449 USA to this opportunity.
Questions and Answers.pdf RFQ 12444526Q0013.pdf Attachment D SaddleValve And StemAsBuilt.pdf Attachment G Wage Determination.pdf Attachment B CelinaValveInformation.pdf Attachment E Statement of Work.pdf Attachment F U38ValveInformation.pdf Attachment A CelinaSaddleU38Specifications.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.