The response deadline has passed. Review the details for future reference or to track similar opportunities.
5.5.26 Amendment 05 - Changes and Time Extension 4.22.26 Amendment 04 - Adding FAR Clause, Question & Answers and Building Drawings 4.17.26 - Site Visit Sign-in Sheet 4.8.26 Amendment 03 - Adding Technical Specifications 4.6.26 Amendment 02 - Updated project site location 4.6.26 Amendment 01 - Updated Mandatory Site Visit Information Central , DC has identified a need to procure for modernization of three (3) passenger elevators and one (1) freight elevator. Also as a requirement, the elevator motor room must have its own separate entrance. Therefore the contractor will close off the current entrance from the engineer's room and bulid an outsidedoor with stairs to comply with building codes. Deatrice Luck Alternative
Point of Contact Joshua Hassler Contracting , 8th FL WASHINGTON, DC 20534 USA to this opportunity. AMND 05.pdf AMND 04.pdf Site Visit Sign-in Sheet_04.15.26.pdf UNICOR Elevators Final Bid Specs 3-18-26.pdf AMND 02.pdf AMND 01.pdf ISO219-26.pdf PAST PERFORMANCE QUESTIONNAIRE (2).pdf FORMSF-25A PAYMENT BOND.pdf FORM
Get matched to contracts like this daily
Free AI-powered contract matching for your business.