The Department of Energy is procuring the replacement of breakers at the Sidney Substation, which includes demolition, site development, and installation of government-furnished electrical equipment. Key requirements involve the installation of three power circuit breakers, three CCVTs, and associated infrastructure such as grounding systems and insulated cables.
Get your fit score, win probability, and required capabilities.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govSidney Substation Breaker Replacement; SD566 SD662 SD862 BREAKER REPLACEMENTS: demolition and site development, foundations and platforms for substation electrical equipment, installation of three (3) Government-furnished power circuit breakers, installation of three (3) Government-furnished CCVTs and two (2) Government-furnished CCVT support pedestals, and furnishing and installing high voltage bus, grounding system, conduit, and insulated cables. Pratt, John W. Contracting . CROSSROADS BLVD (No Street Address
2) LOVELAND, CO 80538 USA
Get matched to contracts like this daily
Free AI-powered contract matching for your business.