Lake Wedington Waterline Construction in Arkansas

USDA
FFP
$12K – $146K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Agriculture is procuring the construction of waterline facilities at Lake Wedington in Arkansas. This project involves the replacement of existing distribution lines and the installation of a new potable water supply line, requiring approximately 22,000 linear feet of waterline installation. The contract will be awarded as a firm-fixed price to the lowest responsive bidder, with a project magnitude between $1 million and $2 million.

Generated 30d ago

Scope & Requirements

The project includes the complete replacement of existing distribution lines and the installation of a new potable water supply line at Lake Wedington.

Contract Details

Contract Typei
FFP
Contract Value
$12K – $146K per task order
IDIQ ceiling: $2M
Similar contracts award $12K$146K (median $32K, 4,010 awards)
Period of Performance
160 days after award, no later than 2026-09-30
NAICS Codes
Place of Performance
Fayetteville, ARKANSAS, USA

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside (FAR 19.5)

Agency & Contact

Contracting Organization

Agency
AGRICULTURE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 2, 2026
Last Updated3mo ago
Mar 2, 2026
Became Sources Sought3mo ago
Mar 2, 2026
Tracked
Site Visit3mo ago
Mar 10, 202610:00 AM CDT
Mandatory
Response Due2mo ago
Mar 27, 2026
Questions Deadline2mo ago
Mar 27, 2026
Bids Deadline1mo ago
Apr 24, 202610:00 AM CDT

Description

Project Title: Lake Wedington Waterline Construction, ARKANSAS Original Set Aside: Total Small Business NAICS Code: 237110 Water and Sewer Line and Related Structures Construction PSC: Z2NE REPAIR OR ALTERATION OF WATER SUPPLY FACILITIES Type of Contract: This is a Invitation for Bid (IFB) which will result in award of a firm-fixed price contract. Award will be made to the lowest responsive, responsible bidder. Magnitude: The magnitude of this project is between: $1M and $2M. Location: Lake Wedington Recreation Area, Fayetteville, Arkansas; Ozark-St. Francis National Forests. entrance gate to Lake Wedington Rec Area (west of Fayetteville, AR -off AR State Hwy 16). See Attachment 001through 003 for complete details.

Scope of Work: This project will include elements from two separate designs: complete replacement of existing distribution lines (Package

001) and new potable water supply line (Package 002). The distribution system includes demolition of existing lines and valves and installation of approximately 16,000 linear feet of waterline (sizes range from 1-inch to 6-inch) from the existing Forest Service 22,000-gallon water storage tank to the day-use area and campground. The supply line includes installation of approximately 6000 linear feet of 3-inch waterline from Krie Road to the existing Forest Service 22,000-gallon water storage tank. Schedule and Deadlines: Site Visit:

10 Mar 2026, 1000CT. Offerors are highly encouraged to attend the site visit. Meet at the entrance gate to Lake Wedington Rec Area (west of Fayetteville, AR - off AR State Hwy 16). USFS

Point of Contact is Danny Sims (479) 223-2176, [email protected]. RVSP is requested by