Upgrade Generator Control System

State DepartmentSol: 19AU9026Q0015
est. $50K – $350K
Quick Brief

The Department of State is procuring an upgrade to the generator control system, which includes decommissioning the existing system, installing a new control system, and ensuring spare parts availability for a minimum of 10 years. The contractor will be responsible for the execution planning, installation, commissioning, and customer training, with work scheduled to minimize generator downtime. Compliance with various regulations and standards is required throughout the project.

Generated 22d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The work involves upgrading the generator control system, including the removal of the existing system and installation of a new control system, ensuring compliance with relevant regulations.

Contract Details

Estimated Value
est. $50K – $350K
Period of Performance
October 2026
Place of Performance
Washington, DC, USA

Agency & Contact

Contracting Organization

Agency
STATE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published24d ago
Jul 1, 2026
Became Solicitation23d ago
Jul 1, 2026
Tracked
Last Updated21d ago
Jul 3, 2026
Response Duein 13d
Aug 6, 2026

Description

The upgrade of the generator control system consists of, but is not limited to the following: Execution planning Decommissioning, Removal and disposal of existing generator control system Disconnection, removal and disposal of existing ACON Generator control system ​​​​​​Delivery, installation and commissioning of new generator control system​​​ Delivery (HW & SW), installation and connection of new DSE 8620MKII (or equal) control system The Contractor guarantees spare parts availability (software and hardware components) for a minimum of 10 years. Commissioning, test run Customer training/documentation ​​​​​​​​​​​​​​​​​​​​Under the contract the contractor assumes full and unlimited responsibility for the right choice and correct workmanship of flawless material as well as for proper and professional completion. Regulations/standards incl. electro- technical safety regulations: ÖNORM B 2110 General terms for construction work ETG 1992 electrical engineering law ÖVE/ÖNORM- E 8101 ÖVE/ÖNORM- E 8015-1-3 ÖVE/EN 1 DIN German industrial standards VDI guidelines Upgrade MTU 500kVA- Generator Control system- work must be scheduled for a weekend between Fr, 5pm until Su, 7pm. Generator downtime must be always kept to a minimum. Planned Execution period: Ocotober 2026 Zahid Raja Alternative

Point of Contact Norbert Tritscher Contracting , 2201 C ST NW (No Street Address

2) WASHINGTON, DC 20520 USA to this opportunity. 19AU9026Q0015_SF1449.pdf 19AU9026Q0015_Solicitation_doc.pdf