The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is seeking contractors for a Design-Build contract to replace the roof of Building 1130 at Shaw AFB. Key requirements include complete demolition of the existing roofing system, installation of a new standing seam metal roofing system, redesign of the drainage system, and compliance with specific construction guidelines.
The contractor will execute a complete roof replacement for Building 1130, including demolition of the existing roof, installation of a new roofing system, and redesign of the drainage system.
This is a Sources Sought Notice and is issued solely for market research and planning purposes to identify potential sources capable of providing the construction needs for a Design-Build (DB) contract to execute a complete roof replacement for Section A of Building 1130 (highlighted in the Condition Assessment Report) at Shaw AFB. The contractor shall provide all design, engineering, labor, materials, equipment, and supervision necessary to: a) Completely demolish the existing roofing system down to the structural concrete deck to include the elevator shaft roof. b) Repair the spalls and cracks on the existing concrete deck. Prepare the concrete deck with a new air & vapor barrier and insulation board for a standing seam metal roofing retro fit/hugger system. c) Design and install a new, fully compliant, Single Sloped Hydrostatic Standing Seam Metal Roofing hugger system incorporating an adequate slope to ensure positive water drainage/flow. The slope of the new SSMR will be directed to the back of the building. The height of the new SSMR must not be higher than the existing front building’s parapet wall height primarily to maintain the overall aesthetic of the building’s front. Demolish all parapet wall in the rear building area to incorporate a new external drainage system at the rear of the building. All existing drainage and appurtenances of the building is to be sealed and removed. d) Design and install a new, 2-ply, cold-applied SBS Modified Bitumen roofing system, complete with new insulation for the elevator shaft. The system shall be drained via new scuppers designed to discharge water onto the new main standing seam metal roof. e) Engineer and execute a comprehensive redesign of the drainage system, demolishing the 25 existing internal drains, in its entirety. The new external drainage system will be located at the back of the building. The sizing of the gutters, downspouts and tie-in locations to the storm drains must be designed to handle the massive volume and velocity of water from a 100-year storm event impacting the entirety of the new roof. f) Demolish the existing penthouse roof access. Demolish all existing access past the floor below the roof as these appurtenances are no longer required. Provide all necessary renovations and additions to structurally frame and fill the opening left from the penthouse demolition. Provide all necessary renovations and additions to retain stairway functions, fire rating and overall operations after transformation (drop down ceiling, lights, fire protection system etc). g) Remove and replace all metal coping on all the remaining parapet walls, including the elevator shaft. h) Extend existing vents, roof curbs, ducts and other penetrations as required and flash properly. i) Install a new Horizontal Lifeline System / Fall Protection System. j) Ensure all work complies with the Unified Facilities Criteria (UFC), UFC 3-110-03 Roofing, the Shaw AFB Design and Construction Guide, and all attached specifications. k) Accomplish the work while omitting/minimizing operational impact on the fully functional, 24/7 mission-critical B1130 facility. 2. Submission
Requirements: Interested vendors are invited to submit the following information: Company Information Company name, address, and
point of contact (name, email, phone) CAGE code and UEI (if available) Applicable NAICS codes Capabilities Statement Description of your ability to fulfill the listed
requirements in the Statement of Work Indicate your ability to perform at Shaw, AFB. 3. Submission Instructions: Response Deadline:
13 March 2026, 4:00 PM EST Submission Method: Email responses to [email protected] Subject Line: Sources Sought Response - B1130 Roof Replacement. Disclaimer: This Sources Sought is issued solely for information and planning purposes and does not constitute a solicitation. This notice shall not be construed as a commitment by the Government to issue a solicitation or award a contract. The Government will not reimburse any costs incurred. Hutton Cobb to this opportunity. Attachment 03 - Shaw AFB Design Constr.pdf Attachment 01 - CAR B1130-HQ_AF.pdf Attachment 07 - FOR CONSTRUCTION - Drawings Volume 2 Shaw AFB B1130.pdf Attachment 02 - Bldg 1130 I.R Scan Report.pdf Attachment 09 - UFC_3-110-03.pdf Attachment 08 - Modified Bituminous Roof System Specification.pdf SOW VLSB 26-0069.pdf Contract Environmental Provisions.pdf DD Form 1354 - AUG 2022.pdf CATEX list with examples.pdf