Expand Electrical Capability Through Design Services

Veterans Affairs (VA)Sol: 36C25925R0113
SDVOSBFFP
$769K

This contract has been awarded

This opportunity is closed. Review the award details to understand pricing and competitors for future similar contracts.

🏆 Award Details

Awarded To
CITRINE LLC
Award Amount
$769K
Location
LAKEWOOD
UEI
JKPGTKHSKRP4
Award Date
July 16, 2026
Quick Brief

The Department of Veterans Affairs is procuring design services to expand the electrical capacity at the Grand Junction VA Medical Center. The project involves remodeling existing electrical rooms and creating a new eastern electrical room to support future expansions and temporary facilities. The contractor must provide comprehensive electrical, architectural, and mechanical designs adhering to NEC and VA standards.

Generated 5d ago

Scope & Requirements

Provide A-E design services for expanding electrical capacity at the Grand Junction VA Medical Center, including a remodel of the northern electrical room and the creation of a new eastern electrical room with specific power requirements.

Deliverables

  • Electrical designs
  • Architectural designs
  • Mechanical designs

Contract Details

Contract Typei
FFP
Awarded Amount
$769K
Similar contracts award $72K to $820K (median $257K, 101,934 awards)Within typical range
NAICS Codes
Place of Performance
Grand Junction, CO, USA
Set-Asides
SDVOSB

Qualifications & Eligibility

Set-Aside Category
SDVOSB

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published7d ago
Jul 17, 2026
Became Solicitation6d ago
Jul 17, 2026
Tracked
Last Updated4d ago
Jul 19, 2026

Description

This contract will provide designs for expanding the electrical capacity of the Grand Junction VA Medical Center. The A-E is to provide design services to expand the electrical capacity of the Grand Junction VA Medical Center (2121 North Ave, Grand Junction, COÂ 81501). The contractor shall design the following: Statement of Work: The Grand Junction VA Medical Center campus has 22 buildings, with 321,557 gross square feet of space. To expand services, the VA requires additional electrical power on the north and east sides of the campus. The northern electrical room remodel will support future expansions while the newly created eastern electrical room will support temporary facilities that provide workspaces for displaced employees. In the past, temporary spaces have been modular in nature and could be tents, trailers or other types of temporary facilities. Most work will be conducted indoors, however, Grand Junction, CO has a semi-arid climate, with hot summers and generally mild winters. During the summer months temperatures typically reach into the 90s Fahrenheit during the day, while evenings tend to remain comfortable and cool. Winters are usually mild, but snow does occur, and temperatures can cool down to freezing averages. Spring and fall tend to be transitional seasons with moderate temperatures. The area receives around ten (10) inches of precipitation per year with most of it falling from April through August. Specific project tasks: Remodel and add on to 1634-1 (433 SF) / 1635-1 (433 SF) to ensure adequate electrical utilities exist to support the north portion of the WCHCS on the Grand Junction, CO campus. This will include expanding the rooms by 800 SF to the west. This additional space will allow the hospital to add switchboards and panels when needed and enclose an Automatic Transfer Switch (ATS). Add a new electrical room to ensure adequate electrical utilities are in place on the eastern side of the WCHCS on the Grand Junction, CO campus. This will provide electrical capacity from location 1 on the western side of the WCHCS to location 2 (see attachment A) on the eastern side. The minimum power

requirements are three-phase, 208V, 800A and include normal, critical, life safety and emergency power circuits. This electrical run will terminate in a new conditioned electrical space at location 2 after passing through necessary electrical step-down equipment at site 3. Any future projects that have temporary facilities will be designed to be compatible with 208V and use no more than 80% of the amperage available per branch circuit. These facilities will be expected to run power from their location to the new electrical room distribution point designed at location 2. All aspects of the design must adhere to the NEC Design manuals posted on the VA technical information library at the following sites: http://www.cfm.va.gov/til/ and https://vatilms.va.gov/vatilms/catalog. All electrical, architectural, and mechanical work for these systems will be designed by the A-E. The installation must, at a minimum, be in accordance with all applicable codes indicated in the Department of Veterans Affairs (VA) Design Manuals and VA Publications (Master Construction Specifications, Construction Standards, National Fire Protection Association (NFPA), Underwriters Laboratory, International Building Code IBC 2003, NFPA and National Electric Code (NEC), building codes and standards, and VA Information Security Handbook 6500.6, etc.). DESIGN CRITERIA: As part of the design the following list needs to be considered: All electrical work will be terminated by the contractor. The design must be clear who and what is supplied for the termination equipment. Any penetration through any fire barriers whether a floor or wall will be done in this contract to meet VA standards and National Fire Protection Association (NFPA). The contractor shall obtain permits issued by the facility before any penetration shall occur. The installed system and its components shall be tested and commissioned. This will be included in the design and construction documents. Implement new technologies in electrical systems to improve and facilitate energy usage reductions. The system will be compatible with the existing control systems on station. All finishes will be coordinated with the VA interior designer and called out in a finish schedule. All testing and balancing parameters will be provided by the A-E. Design documents that show the red lines will be submitted by the contractor to the A-E, put into the AutoCAD drawings and submitted within 30 days of the completion of the construction project. According to VA standards as outlined in the VA Specifications Technical Library. All existing utilities which are designed to be relocated or modified shall have directions to the contractor on the new location and modifications. Mark Holland