The Department of Homeland Security is procuring services for the repair and rebuilding of the ship service diesel generator on the USCGC Munro. The contractor will provide a Caterpillar certified technician to install and program the Electronic Modular Control Panel and Electronic Control Module, ensuring the generator operates correctly. The work is to be completed by July 2026, with a final report due within three days of the contract's performance period.
The contractor will provide technical expertise to install and program the EMCP and ECM in the No. 2 SSDG on the USCGC Munro, ensuring it operates normally.
2 SHIP SERVICE DIESEL GENERATOR EMCP and ECM INSTALL
Background. Munro has had several issues with the Load Sharing and speed control of the #2 SSDG over the last several weeks. With extensive trouble shooting all results have not corrected the issue. When singled up the generator will not hold the load and cause a “brown out” when in parallel with the other generators trips offline under reverse power relay condition. Ships engineers found Electronic Modular Control Panel (EMCP 3.2) and Electronic Control Module (ECM) faulty which are now obsolete. Cat tech is needed to install both modules and reprogram to stabilize generator. Scope. Caterpillar certified Tech Rep to provide parts and install EMCP and ECM in the #2 SSDG control panel. MUNRO SSDG serial is NSC 006. The Tech Rep will be responsible for the following: Providing technical expertise to install all parts and programing in the SSDG’s local operating panel Supply parts and wiring needed for completion Test local operation after install to confirm proper operation of the 1SSDG. Provide a condition Trip report once completed. GFE: NA Contractor Furnished Equipment: EMCP part number: 4529414 PANEL GP-ELE, ECM part number 511 3143. Tasks. The contractor shall provide technical expertise to install EMCP and ECM in the No. 2 SSDG to normal operation. Delivery. Contractor shall provide a final report within 3 days of contract
period of performance.
Place of performance: CGC MUNRO Attn: Engineer Officer USCG Base Kodiak, 5th St, Kodiak Station, AK 99619
Period of performance- 3 July – July 2026 Points of Contact. 10.1. USCG-SFLC-LRE PL Asset Management: LTJG Igor Guerrero, [email protected] 510-685-0519 DONNA O'NEAL Alternative
Point of Contact ULISES BALMACEDA Contracting , BLDG 50-7 (No Street Address