The Department of Energy is seeking a subcontractor for the demolition of existing buildings and equipment at the SLAC Master Substation to facilitate the installation of power factor correction systems. The work includes the disassembly and removal of metal buildings B308 and B311, a non-operational synchronous condenser, and related electrical equipment. This opportunity is currently a sources sought notice, and interested vendors should submit their capabilities statement to the designated contact.

Generated 5d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The work involves the demolition of existing structures and equipment to prepare for the installation of power factor correction systems at the SLAC Master Substation.

Contract Details

Estimated Value
est. $46K – $3.9M
Place of Performance
Menlo Park, CA, USA

Agency & Contact

Contracting Organization

Agency
ENERGY, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published6d ago
Jul 18, 2026
Became Award Notice6d ago
Jul 18, 2026
Tracked
Became Special Notice6d ago
Jul 18, 2026
Tracked
Became Solicitation6d ago
Jul 18, 2026
Tracked
Last Updated5d ago
Jul 19, 2026
Response Datetoday
Jul 24, 202610:00 AM PDT
Response Duetomorrow
Jul 24, 2026

Description

The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. SLAC receives power at its Master Substation (MSS) from a PG&E 230kV transmission line via two 230kV/12.47kV stepdown transformers. SLAC identifies that its AC power system encounters power factor issues at the point of connection (POC) with PG&E, where the power factor strays outside the contractual range (0.97 lag to 0.99 lead). This deviation stems from various factors, including reactive power imbalances, capacitive or inductive loads, etc. Consequently, suboptimal power factor conditions can result in increased power losses, reduced system efficiency, and involve potential penalties imposed by PG&E. To address this challenge, SLAC plans to implement power factor correction measures through the installation of two switched power factor correction (PFC) systems – one on 12.47 kV Bus-1 and another on 12.47kV Bus-2 at the Master Substation (MSS). These PFC units will dynamically improve reactive power flow, compensating for system reactive power demand, and maintaining the overall power factor within the required range. Enhancing power factor correction in this manner will optimize energy utilization, reduce system losses, and ensure continued compliance with PG&E contractual

requirements. Purpose: Prior to the installation of the new power factor correction equipment, it is necessary to demolish existing buildings (B308 and B311) with equipment inside them to create adequate space within the MSS Yard. This Statement of Work outlines the scope for the demolition, disassembly, and removal of existing assets, including metal buildings B308 and B311, a non-operational synchronous condenser, and the associated electrical equipment and cabling and wiring serving the condenser. All identified buildings and equipment are located in the SLAC MSS Yard. THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUMBIT BIDS. While the draft RFP package has been included with this post, the RFP has not been released. Interested vendors should express their interest by sending their capabilities statement to Doreen Agbayani at [email protected]. doreen agbayani Contracting (No Street Address

2) Menlo Park, CA 94025 USA to this opportunity. B2_07.1_DBA_WD_CA20260018_7.14.26_Mod_06_DRAFT.pdf B2_05.1_Fixed_Price_Construction_March2024_DRAFT.pdf B2_09.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI)_DRAFT.pdf B2_07.4_SF1413_DRAFT.pdf B2_07.3_Work_ _Form_367094_DRAFT.pdf B2_04_Section_F_(Deliveries_Performance)_DRAFT.pdf B2_07.6_NTP_Submittal_Checklist_061424_DRAFT.pdf B2_09.0_Section_L_Instruction_to_Offerors_DRAFT.pdf B2_07.5_SubcontractorFormSQF_DRAFT.pdf B2_10_Section_M_Evaluation_Methodology_DRAFT.pdf B2_05.0_Section_G_(General_TsCs)_DRAFT.pdf B2_07.2_Subcontractor_Form_IIPP_052121_DRAFT.pdf B2_07.8_Construction_Subcontracts_Final_Release_DRAFT.pdf B2_07.0_Section_J_(List_of_Attachments)_DRAFT.pdf B2_06_Section_H_(Special TsCs)_DRAFT.pdf B2_08.0_Section_K_(Rep_and_Certs)_DRAFT.pdf B2_07.7_Final_Inspection_Report_DRAFT.pdf B2_09.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet_DRAFT.pdf B2_08.1_Reps_and_Certs_Supplement_DRAFT.pdf B2_01_Section_A_(Subcontract_Form)_DRAFT.pdf B2_02_Section_B_(Supplies_or_Services_and_Price_Costs)_DRAFT.pdf B2_00_RFP_Cover_DRAFT.pdf B2_03.0_Section_C_(Specifications_SOW)_DRAFT.pdf B2_03.3_SLAC BIO Adopted Codes and Standards (Updated 01012025)_DRAFT.pdf B2_03.1_SOW_RPC