This opportunity is closed. Review the award details to understand pricing and competitors for future similar contracts.
Project Number: 558-22-172 Replace Chillers for AHU 1 and 2 Scope: The
scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications. Construction Period - Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the
Contracting Officer, COR, A&E, and building stakeholders as needed. Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants. Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting. As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats. Hours of Operation and Phasing: Construction should be phased and timed such that: General Operation of the affected areas is not interrupted The facility operates on a 24-hour, 7 day per week schedule Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs. 1st shift construction activities will be allowed with approval of the COR. Contractor to develop and coordinate phasing plan with input from staff and final approval of COR. Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend. Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date. Storage: No storage of any material will be allowed on VA property unless approved by the COR.
Period of Performance: Contractor shall complete this project no later than 270 days after issue of notice to proceed (NTP). Utility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out
requirements. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. The contractor shall submit a request to interrupt any such services to COR, in writing, 20 days in advance of proposed interruption. General
Requirements The contractor’s employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space. Means of Egress: Do not block existing egress for occupied buildings, including paths from exits to roads per NFPA 101 and VA