ActiveSources Sought
Save

Repair Base Perimeter Road at Selfridge Air National Guard Base

Department of Defense (DoD)Sol: W50S8526BA001
SB

This is a Sources Sought notice

The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.

Can you respond to this?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Contract Details

Value
Similar contracts award $32K to $473K (median $130K, 7,685 awards)
NAICS Codes
Set-Asides
SB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published24d ago
Jul 1, 2026
Became Award Notice23d ago
Jul 1, 2026
Tracked
Became Sources Sought23d ago
Jul 1, 2026
Tracked
Last Updated21d ago
Jul 3, 2026
Response Duein 7d
Jul 31, 2026

Description

The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the

requirements found in the specifications, in which case, the more stringent/higher quality

requirements will apply. All work will be coordinated with Base Operations. A Macomb County Soil Erosion Permit will be required for this project. The Contractor shall obtain, pay for, and follow the

requirements of this permit. The work will consist of Construction of new 2 and 3 lane roads. The requirement includes full-depth pavement repairs, mill/overlay, crack repairs, and work along the entire Perimeter Road and Jefferson Ave. All work will be completed IAW drawings Repair Perimeter Rd VGLZ 182035. Installation of subsurface edge drainage for all new pavement sections. Localized grading of the project site to address current inadequate drainage. New paint and markings on all new pavements. The Contractor must maintain a constant flow of traffic during construction. Base perimeter road surfacing to be primarily of HMA Pavement. Existing base perimeter road distance to be resurfaced unofficially is 4.2 miles of primarily two and three lane road, with Jefferson Ave from Main Gate to Wilbur Wright Blvd. being three lanes. Those three lanes make up one mile of the projects 4.2 total miles. Contractor to remove and reinstall steel wedge barriers and jersey barriers throughout construction per the direction of SANGB Security Staff. Steel barriers to be reinstalled at grade to match pre-construction condition. (See

attachments for further information to include base access request form) Base access request form and RFIs can be sent to David Brown at [email protected]. Base access form PW is 127sfs. Site visit will be held on Wednesday

3 June 2026 at 2:00pm EDT. Please have base access request forms in NLT 4 days prior to site visit. Update

Get matched to contracts like this daily

Free AI-powered contract matching for your business.