Installing Trailer Pads and Utility Lines

USDASol: 1240LT26Q0126
SB

Informational notice — track for solicitation

This opportunity is not yet open for proposals. Use this time to prepare — engaging early (capability statement, contacting the agency) can position you for the upcoming solicitation.

Want to track notices like this?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Contract Details

Value
Similar contracts award $13K to $150K (median $35K, 3,862 awards)
NAICS Codes
Set-Asides
SB

Agency & Contact

Contracting Organization

Agency
AGRICULTURE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published18d ago
Jul 7, 2026
Became Special Notice17d ago
Jul 7, 2026
Tracked
Last Updated15d ago
Jul 9, 2026
Response Duein 17d
Aug 10, 2026

Description

This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code. Utilities – Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection. Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code. Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code. Option Items – Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line

requirements. Crushed Aggregate – Grade G Road Base for the trailer pads and roadway Derrick A Dodson Alternative

Point of Contact Jaren McCourt to this opportunity. C04 SF-1442 1240LT26Q0126.pdf C04 1240LT26Q0126.docx C04 SOW 1240LT26Q0126.docx C04 Merged Specs 1240LT26Q0126.docx C04 Project Map 1240LT26Q0126.pdf C04 trailer pad 1240LT26Q0126.pdf C04 Utility Plan 1240LT26Q0126.pdf C04 water details 1240LT26Q0126.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.