ActiveOpen for Bids
Save

Maintenance Dredging of Entrance Channel at Naval Submarine Base Kings Bay

Department of Defense (DoD) > U.S. Army > Engineer Division South Atlantic District JacksonvilleSol: W912EP26BA012
est. $45K – $1.1M
Quick Brief

The Department of Defense is procuring maintenance dredging services for the Kings Bay Entrance Channel located in Camden County, Georgia and Nassau County, Florida. The project includes excavation and distribution of dredged material to specified disposal sites, along with environmental monitoring and quality control measures. Additional options involve debris removal and beach tilling activities.

Generated 30d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The project involves maintenance dredging of the Kings Bay Entrance Channel, including excavation and environmental monitoring.

Contract Details

Estimated Value
est. $45K – $1.1M
Similar contracts award $44K to $1.1M (median $204K, 8,310 awards)Within typical range
NAICS Codes

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division South Atlantic District Jacksonville

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
Jun 23, 2026
Became Solicitation1mo ago
Jun 23, 2026
Tracked
Last Updated29d ago
Jun 25, 2026
Response Datein 18d
Aug 12, 202614:00
Response Duein 19d
Aug 12, 2026

Description

Base project work involves maintenance dredging of the Kings Bay Entrance Channel Cut-1N through Range-E. The excavated material will be distributed among the Fernandina Ocean Dredged Material Disposal Site (ODMDS)(D/A-O), the Fernandina Nearshore Placement Area (P/A-N), the Fort Clinch Placement Area (P/A-F), and the North Beach Placement Area (P/A-NB). Incidental work includes environmental and water quality monitoring, vibration monitoring, beach fill quality control, beach tilling, and sea turtle and sturgeon trawling, and interim demobilization and mobilization (cutter-suction dredges only). Option A project work consists of Fort Clinch pre-placement debris removal. Option B work includes beach tilling from FDEP Monument R-019 to R-029. SEE ATTACHMENT FOR DETAILS Walter Love Alternative

Point of Contact Manuela Voicu

Get matched to contracts like this daily

Free AI-powered contract matching for your business.