Closed
Save

Parking Lot Repair and Drainage System Installation

Department of Defense (DoD) > Defense Logistics Agency (DLA) > DCSO Richmond
firm-fixed price
$32K – $465K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring parking lot repair services for the Defense Supply Center Richmond (DSCR). Key requirements include a 4-inch open-graded drainage layer, compaction, and a separation layer.

Generated 57d ago

Scope & Requirements

The scope of work includes repairing the parking lot at DSCR B41, involving the installation of a 4-inch open-graded drainage layer, compaction, and a separation layer.

Deliverables

  • 4-inch open-graded drainage layer
  • Compaction of drainage layer
  • Separation layer installation
  • Protection of completed drainage layer

Evaluation Criteria

  1. Technical Acceptability
  2. Past Performance
  3. Price

Contract Details

Contract Type
firm-fixed price
Contract Vehicle
request for quote (RFQ)
Awarded Amount
$32K – $465K per task order
IDIQ ceiling: $45M
Similar contracts award $32K$465K (median $129K, 8,020 awards)
Period of Performance
60 days from the issuance of the contract award
NAICS Codes
Place of Performance
Richmond, VA, USA

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside
NAICS Size Standard
$45M
Past Performance
Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS.
Required Registrations
  • SAM.gov

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
Defense Logistics Agency
Office
DCSO Richmond

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Site Visit2mo ago
Mar 25, 202613:00
Published2mo ago
Mar 31, 2026
Last Updated2mo ago
Mar 31, 2026
Questions Due2mo ago
Mar 31, 2026
end of day
Became Award Notice2mo ago
Mar 31, 2026
Tracked
Response Due2mo ago
Apr 7, 2026
Quotes Due2mo ago
Apr 7, 2026
end of day

Description

RFI's: 1. Material Specification The required material for the 4" open-graded drainage layer should be a hard, durable, crushed aggregate that meets the gradation for a Rapid Draining Material (RDM) or Open Graded Material (OGM) as specified in UFC 3-250-01, Chapter 20. The material must provide sufficient stability for construction equipment and have a minimum permeability of 1,000 ft/day. 2. Compaction

Requirements This layer must be compacted. Per UFC 3-250-01, Appendix B, compaction of drainage layers is achieved with a specified effort, in this case, six passes of a 10-ton vibratory roller, rather than a final density percentage. This ensures the aggregate is stable without crushing it, which would reduce its permeability. 3. Additional Installation

Requirements Based on UFC 3-250-01, the following additional

requirements apply: Separation Layer: A granular separation layer (minimum 50 CBR) or an approved geotextile fabric must be placed directly beneath the drainage layer to prevent contamination from the subgrade. Placement: The aggregate should be placed to ensure uniform thickness and prevent segregation. It should be placed on the prepared VDOT 21A subbase to a compacted thickness of 4 inches. Protection: The completed drainage layer must be protected from contamination and disturbance. The subsequent pavement layer should be placed as soon as possible. --------------------------------------- Update

30 March 2026: Typos identified. The CORRECT timing for this RFQ is:

Questions

Get matched to contracts like this daily

Free AI-powered contract matching for your business.