The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Energy is procuring HVAC replacement services for the Beam Position Monitor Rooms in Buildings 116 and 132 at the SSRL facility. The contractor must provide all necessary labor, materials, and equipment to safely complete the work, adhering to specific safety and compliance standards. The project is scheduled to be performed primarily during the Summer 2026 shutdown.
The contractor will remove and replace the HVAC systems servicing the Beam Position Monitor Rooms in Buildings 116 and 132, ensuring compliance with safety and operational standards.
The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. The subcontractor shall remove and replace, in its entirety, the HVAC systems servicing the Beam Position Monitor (BPM) Rooms in Buildings 116 and 132. All construction activities must be performed primarily during SSRL’s Summer 2026 shutdown, scheduled from July 21, 2026 through October 1, 2026, with the HVAC system operational no later than September 19, 2026. If equipment lead times prevent full completion by this date, the project shall be phased to complete as much work as possible during the Summer 2026 shutdown, with any remaining work performed during the Summer 2027 shutdown. doreen agbayani Contracting (No Street Address
2) Menlo Park, CA 94025 USA to this opportunity. B2_07.1_DBA_WD_CA20260018_1.30.26_Mod_04.pdf B2_05.1_Fixed_Price_Construction_March2024.pdf B2_07.4_SF1413.pdf B2_07.3_Work_ _Form_363431.pdf B2_07.6_NTP_Submittal_Checklist_061424.pdf B2_07.5_SubcontractorFormSQF.pdf B2_07.2_Subcontractor_Form_IIPP_052121.pdf B2_09.0_Section_L_Instruction_to_Offerors.pdf B2_05.0_Section_G_(General_TsCs).pdf B2_10_Section_M_Evaluation_Methodology.pdf B2_03.0_Section_C_(Specifications_SOW).pdf B2_01_Section_A_(Subcontract_Form).pdf B2_07.8_Construction_Subcontracts_Final_Release.pdf B2_08.1_Reps_and_Certs_Supplement.pdf B2_08.0_Section_K_(Rep_and_Certs).pdf B2_07.0_Section_J_(List_of_Attachments).pdf B2_06_Section_H_(Special TsCs).pdf B2_04_Section_F_(Deliveries_Performance).pdf B2_07.7_Final_Inspection_Report.pdf B2_09.1_Section_L_Attachment_B_Proposal_Breakdown_Sheet.pdf B2_09.2_Section_L_Attachment_A_SLAC_Question&Answer_Log_(RFI).pdf B2_00_RFP_Cover.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.