Closed
Save

Remanufacture C-130 Fuel Boost Pump

Department of Defense (DoD) > U.S. Air Force > AIR FORCE MATERIEL COMMANDSol: FD20302501813
8(a)HUBZoneSDVOSBWOSBFFP

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring the remanufacture of C-130 Fuel Boost Pumps to support the Air Force's aircraft fuel systems. This contract requires the contractor to provide all necessary labor, facilities, equipment, and materials to restore the pumps to like-new condition, including disassembly, cleaning, inspection, maintenance, reassembly, testing, and finishing. The anticipated contract is a firm fixed price indefinite delivery indefinite quantity type with a duration of five years.

Generated 19d ago

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Typei
FFP
Contract Vehiclei
IDIQ
Estimated Value
Not specified
Similar contracts award $2K$37K (median $9K, 165,828 awards)
Period of Performance
5 years
NAICS Codes
Place of Performance
Tinker AFB, OK, USA
Set-Asides
8(a), HUBZone, SDVOSB, WOSB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE AIR FORCE
Office
AIR FORCE MATERIEL COMMAND

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published20d ago
May 15, 2026
Became Sources Sought19d ago
May 15, 2026
Tracked
Became Solicitation19d ago
May 15, 2026
Tracked
Last Updated18d ago
May 17, 2026
Response Date3d ago
Jun 1, 202615:00
Response Due2d ago
Jun 1, 2026

Description

5.101(a) The United States Air Force through Air Force Sustainment Center (AFSC), Tinker AFB 73145 is contemplating issuing a firm fixed price IDIQ Type contract to support the remanufacture of the C-130 Fuel Boost Pump(s). The Fuel Boost Pump transfers fuel from the C-130's aircraft fuel tanks to the aircraft's engines. The Fuel Boost Pump has dual impellers to allow fuel to be supplied to the engines during both normal and inverted flights. The contractor shall provide all labor, facilities, equipment and all material to accomplish remanufacture. The work encompasses the disassembly cleaning, inspection, maintenance re-assembly, testing, and finishing actions required to return the item to a like-new condition in accordance with the solicitation

requirements and all

attachments. A firm fixed price Indefinite Delivery

Requirements type contract is contemplated with a 5-year basic. The

requirements set forth in this notice are defined per Purchase Request FD20302501813 as follows: Written response is required. Item 0001: Remanufacture Fuel Boost Pump Application: C-130 (NSN): 2915-01-394-8476 (PN): RR54860A-1 Min: 60 Max: 100 Item 0002: Over and Above. To be negotiated. Item 0003: Data (Not Separately Priced) Function: PUMP, SUBMERGED, AIRC Transfer fuel within the aircraft. Dimensions: Length: 9.8000” x Width: 3.7000” x Height 8.5000” and weighs 5.7000 lbs. Material: Aluminum Alloy Delivery: 20 (each) every 60 days ARO and reps. Early delivery is acceptable Ship To: DLA DISTRIBUTION DEPOT OKLAHOMA 3301 F AVE CEN REC BLDG 506 DR 22 TINKER AFB OK 73145-8000 73145-8000 USA Duration of Contract Period: 5-YEAR INDEFINITE DELIVERY INDEFINITE QUANTITY TYPE CONTRACT Qualification

Requirements: QUALIFICATION

Get matched to contracts like this daily

Free AI-powered contract matching for your business.