The response deadline has passed. Review the details for future reference or to track similar opportunities.
The U.S. Army is procuring a hydraulic vertical pivot gate for installation at Fort Peck to support water control and flood management operations, requiring durable, corrosion-resistant materials and integration with existing hydraulic systems.
Installation of a hydraulic vertical pivot gate at Fort Peck for water control and flood management, including integration with existing hydraulic infrastructure and compliance with structural and environmental standards.
No description available
Get matched to contracts like this daily
Free AI-powered contract matching for your business.