Closed
Save

Long-Term Management of Operable Units 1, 2, and 3 at West Virginia Ordnance Works

Department of Defense (DoD) > U.S. Army > US ARMY CORPS OF ENGINEERS ENGINEER DIVISION GREAT LAKES AND OHIO
8(a)
est. $792K – $29.1M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The U.S. Army Corps of Engineers intends to award a sole-source contract modification to SRS-Alliant JV for ongoing Long-Term Management (LTM) services at the Former West Virginia Ordnance Works site. Key requirements include redevelopment of groundwater wells, site maintenance, and project document organization to ensure compliance with environmental regulations.

Generated 74d ago

Scope & Requirements

The work involves ongoing Long-Term Management of the Former West Virginia Ordnance Works site, including environmental monitoring and compliance activities.

Deliverables

  • Redevelopment of existing groundwater wells
  • Construction of new well pads
  • Site and soil cover maintenance
  • Project document organization

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Vehicle
Sole-source contract modification
Estimated Value
est. $792K – $29.1M
Similar contracts award $71K$837K (median $251K, 105,964 awards)Above typical range
Incumbent Contractor
SRS-Alliant JV
NAICS Codes
Set-Asides
8(a)

Qualifications & Eligibility

Set-Aside Category
ND

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE ARMY
Office
US ARMY CORPS OF ENGINEERS ENGINEER DIVISION GREAT LAKES AND OHIO

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 13, 2026
Last Updated3mo ago
Mar 13, 2026
Became Solicitation3mo ago
Mar 13, 2026
Tracked
Response Due Date2mo ago
Mar 24, 202613:00
Capability statements must be submitted by this date.
Response Due2mo ago
Mar 27, 2026
Response Date1mo ago
Apr 24, 202613:00

Description

The U.S. Army Corps of Engineers (USACE), Louisville District, intends to award a sole-source contract modification to SRS-Alliant JV (CAGE: 866A1, UEI: C31QGN9M27Q7) under Contract No. W912QR21D0043, Delivery Order No. W912QR25FA020. The Former West Virginia Ordnance Works is a Formerly Used Defense Site (FUDS) requiring ongoing Long-Term Management (LTM) for Operable Unit (OU) 1, OU-2, and OU-3. Current LTM activities include monitoring and sampling of groundwater, surface water, and sediment; reporting; and regulatory support in compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The purpose of this modification is to procure environmental services at the Former West Virginia Ordnance Works (WVOW) Formerly Used Defense Site (FUDS). Due to unforeseen private land development at the site, several compliance groundwater monitoring wells in the Long-Term Management (LTM) network have become inaccessible. To ensure the project remains in compliance with its Record of Decisions, the following additional services are required: Redevelopment of existing, inactive groundwater wells and construction of new well pads to serve as replacements in the LTM network. Site and soil cover/cap maintenance (mowing). Project document organization. AUTHORITY AND JUSTIFICATION This action is being procured pursuant to 10 U.S.C. 3204(a)(1) as implemented by Revolutionary FAR Overhaul (RFO) 6.103-1, Only One Responsible Source and no other supplies or services will satisfy agency

requirements. SRS-Alliant JV is the incumbent contractor currently performing the LTM services at the site. Awarding this requirement to any other source would result in: Substantial Duplication of Cost: A new contractor would be required to replicate project management plans, safety plans, and quality control plans already developed by SRS-Alliant, resulting in a significant and unrecoverable duplication of cost to the Government. Unacceptable Delays: The time required for a new competitive procurement and contractor onboarding would delay the critical field work by an estimated 9 to 12 months, jeopardizing compliance with environmental regulations. SRS-Alliant JV possesses unique, site-specific knowledge and is already mobilized, making them the only source capable of performing these emergent tasks without causing this unacceptable cost and schedule impact. SUBMISSION INSTRUCTIONS This Special Notice is not a request for competitive proposals. However, all responsible sources may submit a capability statement, proposal, or quotation which shall be considered by the agency. Interested parties who believe they possess the capability to perform the required work without causing the substantial duplication of cost or unacceptable delays described herein are invited to submit a detailed capability statement. The capability statement must demonstrate the firm's ability to seamlessly integrate with the ongoing project and meet all

requirements without the need for a lengthy ramp-up period or the development of duplicative project documents. RESPONSE DUE DATE Capability statements must be submitted via email to the no later than

24 March 2026 at 1:00 PM Eastern Time. Name: Kari Rogers Email: [email protected] Kari Rogers Contracting to this opportunity.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.