ActiveOpen for Bids
Save

Generator Monitoring System for Joint Base Charleston

Department of Defense (DoD) > U.S. Air Force
Quick Brief

The Department of Defense is procuring a remote generator monitoring system for Joint Base Charleston to enhance base resiliency by providing real-time situational awareness of generator performance. This system will be installed across 65 generators at four locations and will integrate with the existing EMCS architecture to facilitate rapid response to power disruptions. Key requirements include compatibility with existing generator systems and the ability to replace manual inspection processes.

Generated 9d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Contract Details

Estimated Value
Not specified
Similar contracts award $257 to $34K (median $4K, 8,797 awards)
NAICS Codes
Place of Performance
Joint Base Charleston

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE AIR FORCE AIR MOBILITY COMMAND

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published10d ago
Jul 14, 2026
Last Updated10d ago
Jul 14, 2026
Became Solicitation9d ago
Jul 14, 2026
Tracked
Response Datein 3d
Jul 27, 202614:00
Response Duein 11d
Aug 4, 2026

Description

Joint Base Charleston is seeking manufactures of remote generator monitoring systems and associated services. See

attachments for specifics. This project will procure and install a remote monitoring system for 65 generators across Joint Base Charleston's four geographically separated locations. This system is a data acquisition platform and will be integrated into the existing EMCS architecture, providing instant, centralized notification of any electrical or generator failures. This directly enhances base resiliency by replacing slow, manual inspection processes with real-time situational awareness, allowing for rapid response to power disruptions and ensuring mission continuity. The MP has provided that 18 generator systems have confirmed communication capability compatible with Monico integration. An additional 7 units are believed to be compatible but require additional discovery and confirmation. Approximately 40 units have been identified as older Cummins generators which may or may not currently have the required Cummins network cards and commissioned Cummins ProtoNode gateways installed and operational. Jeffrey Krieger Alternative

Point of Contact Roger "Dale" Crews to this opportunity. JBC Gen data.xlsx Salient Characteristics Remote Generator Monitoring.pdf Minimum Characteristics Remote Generator Monitoring.docx (deleted) 236 KB Public Jul 12, 2026 JBC Gen data.xlsx (deleted)

Get matched to contracts like this daily

Free AI-powered contract matching for your business.